Orange County NC Website
453 <br /> It is necessary to obtain an approved driveway permit and/or encroachment agreement(s) <br /> prior to performing work on the NCDOT right of way. As a condition of the permit, the <br /> permitee shall be responsible for design and construction of the above stipulated <br /> improvements in accordance with NCDOT requirements. An approved permit will be <br /> issued upon receipt of approved roadway and signal construction plans, inspection fee, <br /> and any necessary performance and indemnity bonds. <br /> The applicant shall dedicate any additional right of way necessary to accommodate the <br /> required road improvements or future improvements as stipulated. <br /> Intersection radii and geometry shall be designed to accommodate turning movements of <br /> the largest anticipated vehicle. <br /> All pavement markings shall be long life thermoplastic. Pavement markers shall be <br /> installed if they previously existed on the roadway. <br /> The permitee shall be responsible for the installation and relocation of any additional <br /> highway signs that may be necessary due to these improvements and shall comply with <br /> the requirements of the MUTCD. <br /> Feel free to contact me if you have any questions. <br /> Sincerely, <br /> Docu Sig ned by: <br /> C. N. flwarls Jr. j Pf <br /> C606@6060F8A458... <br /> C. N. Edwards Jr., PE <br /> District Engineer <br /> Cc: Division Engineer <br /> D. M. McPherson, Division Traffic Engineer <br /> Brian Thomas, PE, Regional Traffic Engineer <br /> Doumit Ishak, PE, Congestion Management Regional Engineer <br /> Orange County <br /> Town of Hillsborough <br />