449 <br /> Attachment 1 <br /> Staff Assessment <br /> The TIA states: <br /> • Build out—2023 <br /> • Total Daily trips—3,648 (AADT) <br /> • 2018 Traffic Volume—2,300 (AADT) Davis Road, 6,500 (AADT) Old NC-86 <br /> • Growth Rate— 1% <br /> • Trip Distribution — Davis Road 5%, Old NC-86 15-50% <br /> Hypothetical Scenario -A- using TIA in place of TRM <br /> TRM <br /> Future LOS <br /> NCDOT Traffic Functional 2018 Volume Total (Volume/ <br /> Road Volume Classification Volume (AADT) Capacity Capacity) <br /> Davis 2025 2482 9036 0.27 <br /> Road (SR- 2035 Local Collector 2300 2731 9036 0.30 <br /> 1129) 2045 3004 9036 0.33 <br /> 2025 7229 10045 0.72 <br /> Old NC- 2035 Minor Arterial 6500 7953 10045 0.79 <br /> (SR-1009) 2045 8748 10045 0.87 <br /> Hypothetical Scenario - B - assuming all 3,468 new trips would be on Davis Road OR <br /> Old NC-86 ONLY by 2023 build out. No new employees, vendors, customers, etc. on <br /> other roads <br /> Davis 2025 5948 9036 0.66 <br /> Road (SR- 2035 Local Collector 2300 6543 9036 0.72 <br /> 1129) 2045 7197 9036 0.80 <br /> 2025 10148 10045 1.01 <br /> Old NC-86 2035 Minor Arterial 6500 11163 10045 1.11 <br /> (SR-1009) 2045 12279 10045 1.22 <br />