Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:55:41 PM
Creation date
9/10/2020 3:33:26 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda 09-15-20 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 09-15-20 Virtual Business Meeting
Minutes 09-15-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Minutes 09-22-2020 Continued Virtual Business Meeting from 9/15/2020
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
442 <br /> HCM 6th TWSC <br /> 180: Davis Road & Warehouse D Dvwy. 08/05/2020 <br /> Intersection <br /> Int Delay,s/veh 5.8 <br /> Movement EBL EBT WBT BR <br /> Lane Configurations 4 Y <br /> Traffic Vol,veh/h 4 94 176 8 206 12 <br /> Future Vol,veh/h 4 94 176 8 206 12 <br /> Conflicting Peds,#/hr 0 0 0 0 0 0 <br /> Sign Control Free Free Free Free Stop Stop <br /> RT Channelized None - None - None <br /> Storage Length - - 0 <br /> Veh in Median Storage,# - 0 0 - 0 <br /> Grade, % - 0 0 - 0 <br /> Peak Hour Factor 90 90 90 90 90 90 <br /> Heavy Vehicles, % 2 2 2 2 2 2 <br /> Mvmt Flow 4 104 196 9 229 13 <br /> Major/Minor at ajor2 Ivilnurz <br /> Conflicting Flow All 205 0 0 313 201 <br /> -Stage 1 - - - - 201 - <br /> Stage 2 - - - 112 - <br /> Critical Hdwy 4.12 - 6.42 6.22 <br /> Critical Hdwy Stg 1 - - 5.42 - <br /> Critical Hdwy Stg 2 - - 5.42 - <br /> Follow-up Hdwy 2.218 - 3.518 3.318 <br /> Pot Cap-1 Maneuver 1366 - 680 840 <br /> Stage 1 - - 833 - <br /> Stage 2 - - 913 - <br /> Platoon blocked,% - <br /> Mov Cap-1 Maneuver 1366 - - - 678 840 <br /> Mov Cap-2 Maneuver - 678 - <br /> Stage 1 831 - <br /> Stage 2 913 - <br /> EB WB SB <br /> HCM Control Delay,s 0.3 0 13.1 <br /> HCM LOS B <br /> Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 <br /> Capacity(veh/h) 1366 685 <br /> HCM Lane V/C Ratio 0.003 - 0.354 <br /> HCM Control Delay(s) 7.6 0 - 13.1 <br /> HCM Lane LOS A A - B <br /> HCM 95th%tile Q(veh) 0 - - 1.6 <br /> Hillsborough Industrial Site 4:00 pm 03/19/2020 2023 Build-Improved PM Synchro 10 Report <br /> Stantec Page 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.