Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:55:41 PM
Creation date
9/10/2020 3:33:26 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda 09-15-20 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 09-15-20 Virtual Business Meeting
Minutes 09-15-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Minutes 09-22-2020 Continued Virtual Business Meeting from 9/15/2020
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
441 <br /> Lanes, Volumes, Timings <br /> 140: Old NC 86 & Davis Road II 08/05/2020 <br /> t t <br /> Lane Group EBL EBR NBL NBT SBT SBR <br /> Minimum Split 25.0 25.0 25.0 25.0 <br /> Total Split(s) 25.0 35.0 35.0 35.0 <br /> Total Split(%) 41.7% 58.3% 58.3% 58.3% <br /> Maximum Green(s) 18.0 28.0 28.0 28.0 <br /> Yellow Time(s) 5.0 5.0 5.0 5.0 <br /> All-Red Time(s) 2.0 2.0 2.0 2.0 <br /> Lost Time Adjust(s) -2.0 -2.0 -2.0 <br /> Total Lost Time(s) 5.0 5.0 5.0 <br /> Lead/Lag <br /> Lead-Lag Optimize? <br /> Vehicle Extension(s) 3.0 3.0 3.0 3.0 <br /> Recall Mode None C-Min C-Min C-Min <br /> Walk Time(s) 7.0 7.0 7.0 7.0 <br /> Flash Dont Walk(s) 11.0 11.0 11.0 11.0 <br /> Pedestrian Calls(#/hr) 0 0 0 0 <br /> Act Effct Green(s) 17.5 32.5 32.5 <br /> Actuated g/C Ratio 0.29 0.54 0.54 <br /> v/c Ratio 0.65 0.50 0.52 <br /> Control Delay 24.6 11.8 15.3 <br /> Queue Delay 0.0 0.0 0.0 <br /> Total Delay 24.6 11.8 15.3 <br /> LOS C B B <br /> Approach Delay 24.6 11.8 15.3 <br /> Approach LOS C B B <br /> Intersection Summary <br /> Area Type: Other <br /> Cycle Length:60 <br /> Actuated Cycle Length:60 <br /> Offset:52(87%),Referenced to phase 2:NBTL and 6:SBT,Start of Green <br /> Natural Cycle:50 <br /> Control Type:Actuated-Coordinated <br /> Maximum v/c Ratio:0.65 <br /> Intersection Signal Delay: 16.5 Intersection LOS: B <br /> Intersection Capacity Utilization 76.0% ICU Level of Service D <br /> Analysis Period(min) 15 <br /> Splits and Phases: 140: Old NC 86&Davis Road <br /> to 2 'R'. 04 <br /> s <br /> Hillsborough Industrial Site 4:00 pm 03/19/2020 2023 Build-Improved PM Synchro 10 Report <br /> Stantec Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.