Orange County NC Website
400 <br /> Kimley>>> Horn .ag, <br /> provides the majority of required detail(s), the submittal should be modified as <br /> indicated: <br /> 1. Denote the location of all utility lines (i.e. sewer, water, reclaimed water, <br /> stormwater management, electrical service, cable, telephone, etc.) on the map. <br /> As part of this modification please provide a key/legend detailing: <br /> a. Existing infrastructure in place, <br /> b. What infrastructure is expected to be constructed by Orange County/Town <br /> of Hillsborough, and <br /> c. New infrastructure serving the project. <br /> As part of this requirement, staff will need detailed information on <br /> proposed line types, sizes, anticipated construction, etc. <br /> b. Denote the anticipated location of sidewalks to assist staff ascertain if there <br /> will be any conflicts with utility location. <br /> C. The map will need to be modified to include the detailed design calculations for <br /> the project indicating that the proposed utility lines are sufficient for expected <br /> development and associated/estimated density for the project. <br /> d. Include a note indicating: 'All onsite utilities shall be underground unless <br /> approved by the Board of County Commissioners'. <br /> e. Indicate connection points to various utility lines. <br /> f. Denote the location of any anticipated/planned utility infrastructure (i.e. pump <br /> stations, etc.). <br /> g. Please include the following information on Sheet C-4: <br /> a. Provide detail on anticipated fire flow for the proposed utility lines with <br /> detail on how same will support the project. As a general reminder fire <br /> flow requirements are necessary for consideration when sizing water <br /> lines. <br /> b. Provide detail on the anticipated placement of manholes and elevations <br /> same. This will include the provision of a typical manhole construction <br /> detail. <br /> C. Anticipated stub out locations. <br /> d. All existing and anticipated utility line easements. <br /> e. Provide sufficient detail outlining how the project will comply with the <br /> Town of Hillsborough water/sewer utility line construction standards. <br /> f. Additional detail on expected build-out. This information shall be <br /> essential in evaluating the ability of installed infrastructure to meet <br /> current and future needs of the project. <br /> g. Information outlining opportunities for water and sewer extension to <br /> serve adjacent parcels. <br /> NOTE: The ability to serve surrounding parcels is predicated on said <br /> parcels location within a primary service area as detailed within the <br /> Water and Sewer Management, Planning, and Boundary Agreement <br /> (WASMPBA), the County Comprehensive Plan, and the Orange <br /> County/Town of Hillsborough Joint Planning Land Use Plan. <br />