Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:55:41 PM
Creation date
9/10/2020 3:33:26 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda 09-15-20 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 09-15-20 Virtual Business Meeting
Minutes 09-15-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Minutes 09-22-2020 Continued Virtual Business Meeting from 9/15/2020
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> • SOUTH: Davis Road; Hillsborough United Methodist Church; <br /> Undeveloped property; Single-family residential property zoned <br /> Rural Residential (R-1) ranging in size from 2 to 12 acres. <br /> • EAST: Single-family residential and undeveloped property <br /> zoned Economic Development Hillsborough Limited Office <br /> (EDH-2) ranging in size from 1 to 12 acres; Old NC Highway 86. <br /> • WEST: Single-family residential and undeveloped property <br /> zoned Rural Residential (R-1) ranging in size from 1-'/2 to 50 <br /> acres. <br /> MPD Conditional Zoning (CZ) Process: Involves approval of a rezoning petition and a master <br /> development plan allowing for the development of a specific land use categories. Applications <br /> are processed in a legislative manner (i.e. does not require sworn testimony or evidence) and <br /> decisions are based on the BOCC's determination that the project is consistent with the purpose <br /> and intent of the Comprehensive Plan. <br /> As this is a MPD-CZ proposal, a formal site plan is not required to be submitted as part of the <br /> rezoning approval. Applicants are required to produce a master concept plan consistent with <br /> the provisions of Section 6.7 of the UDO. <br /> The application package was posted to Planning's website on or about June 19, 2020 and can <br /> be accessed at: https:Hwww.orangecountync.gov/1722/Current-Interest-Projects. <br /> Development Process, Schedule, and Action: The typical cadence for the review of a CZ <br /> application is: <br /> • First Action — Planning staff schedules a Neighborhood Information Meeting (NIM). <br /> Staff Comment — DONE. This meeting was held in an on-line format on July 15, <br /> 2020. Notes from this meeting are contained within Attachment 7. <br /> • Second Action — The Planning Board reviews the application at a regular meeting <br /> and makes a recommendation to the BOCC. <br /> Staff Comment - DONE. The Planning Board began review of the project at its <br /> regular August 5, 2020 meeting, which was adjourned to a special meeting on <br /> August 19, 2020 to allow for continued discussion. Excerpts of minutes from both <br /> meetings are contained in Attachment 8. <br /> • Third Action — The BOCC receives the Planning Board recommendation and makes <br /> a decision at an advertised public hearing. <br /> Staff Comment— Being held on September 15, 2020. <br /> NOTE: As the public hearing is being held remotely, there is a 24-hour waiting <br /> period required before the BOCC can make a decision, per State legislation. The <br /> purpose of the 24-hour waiting period is to allow for submission of written <br /> comments. <br /> Per Section 2.9.2 (F) (3) of the UDO, mutually agreed upon conditions can be imposed as part <br /> this process only if they address: <br /> 1. The compatibility of the proposed development with surrounding property, <br />
The URL can be used to link to this page
Your browser does not support the video tag.