Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:55:41 PM
Creation date
9/10/2020 3:33:26 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda 09-15-20 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 09-15-20 Virtual Business Meeting
Minutes 09-15-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Minutes 09-22-2020 Continued Virtual Business Meeting from 9/15/2020
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
399 <br /> Kimley>>> Horn .ag, <br /> Further, revise the Sheet to contain the proposed planting schedule (i.e. <br /> amount of foliage for every 100 linear ft. of the Project) consistent with <br /> previous direction. Staff recommends use of a planting detail on the Sheet <br /> supporting this description and offers the following illustrative example as a <br /> guide: <br /> 3V Iffix { <br /> If <br /> d e o 0 <br /> .s <br /> Note: not taken from County UDO. Graphic is for illustrative purposes only. <br /> Response: Planting detail will be added as requested to the master plans <br /> 35. Comment: Page 13— LU — Provide the following additional detail on Sheet C-2: <br /> 1. A typical public road access cross section detail for the individual <br /> development areas; <br /> 2. A typical interior roadway design standard (i.e. cross section) including <br /> drainage detail(s) and explanation of how drainage will be handled by interior <br /> road systems if at all; <br /> 3. If there is a proposed layout (i.e. creation of individual parcels allowing for <br /> development) please denote same on this map; <br /> 4. Provide language indicating if denoted stormwater control measures (SCMs) <br /> are: <br /> a. For illustrative purposes (i.e. final SCM location shall be determined with <br /> the submittal of a formal stormwater management plan in accordance with <br /> the UDO); <br /> b. Are anticipated to serve as master drainage basin areas or for specific <br /> 'pods'. <br /> Response: 1. The access road is a private road and no cross section will be provided. <br /> 2. The majority of interior roadway drainage will be handled by onsite SCMs. <br /> 3. Individual parcels have been noted in this resubmittal. <br /> 4. The SCMs are based on master drainage basins and illustrative in nature. <br /> 36. Comment: Page 13— 1.1.ii —Sheet C-4: Section 6.7.1 (B) (6) of the UDO requires a map <br /> detailing the utility master plan for the project (Sheet C-4). While the Sheet C-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.