Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:55:41 PM
Creation date
9/10/2020 3:33:26 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda 09-15-20 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 09-15-20 Virtual Business Meeting
Minutes 09-15-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Minutes 09-22-2020 Continued Virtual Business Meeting from 9/15/2020
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
397 <br /> Kimley>>>Horn Jagt <br /> 2 of the three intersections in question connect to 1-40, and one connects with <br /> the road containing three of the development's four total driveways, this is a <br /> concern for staff. <br /> Response: TIA comments will be addressed globally upon receipt of direction from NCDOT. <br /> 33. Comment: Page 11 — 1.B.16—Section 5-1 Vegetated Buffers: <br /> i. Number 1: As proposed, there is a 100 ft. `perimeter structure buffer' along the <br /> external western property line with allowances for parking/internal roads within <br /> 50 ft. of the western property line. <br /> Consistent with the provisions of Section 6.8.12 (C) of the UDO, staff <br /> recommends observing a 100 ft. perimeter buffer for the Project from western <br /> and southern property lines that are adjacent to residentially zoned property. <br /> Staff would agree with allowing trails and/or roadways within this area but not <br /> parking areas. <br /> ii. Number 3: Staff recommends a 30 ft. vegetative/landscape area separating the <br /> Project from both the Service and Davis Road rights-of-way. As written, the <br /> narrative references a 25 ft. 'land use buffer' along Service Road and does not <br /> mention Davis Road. <br /> iii. Number 4: Please indicate buffers along all 'water features' (i.e. streams, <br /> floodplain, wetlands, etc.) shall be preserved consistent with Section 6.13 of <br /> the UDO. As an aside, required buffer is based on slope. There may be areas of <br /> the Project where a 65 ft. stream buffer may be applicable versus an 80 ft. <br /> buffer. <br /> Response: i. In order to observe the recommended stream and floodplain buffers, the <br /> perimeter buffers will remain as proposed. ii:A 30'vegetative/landscape area separating the <br /> project from Davis Road right-of-way will be included, iii:Narrative has been updated <br /> accordingly. <br /> 34. Comment: Page 11 — I.C.1 —Master Plan Set: <br /> 1. Section 6.7.1 (B) (1) of the LIDO requires a map of the development site. While the <br /> master plan map set provides the majority of required detail(s), the submittal should <br /> be modified as indicated: <br /> i. Label and identify the various 'lines' on the submitted map(s). Specifically: <br /> 1. Internal and external property lines; <br /> 2. Internal rights-of-way; <br /> 3. Internal district or'pod' development areas; <br /> 4. Utility lines/easements. Staff recommends the use of a legend <br /> indicating what these lines represent (i.e. project boundary lines, utility <br /> easements, utility service areas, rights-of-way, etc.). <br /> ii. Sheet C-2 should display the floodplain and floodplain buffer area per <br /> Section 6.13 of the UDO; <br />
The URL can be used to link to this page
Your browser does not support the video tag.