Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:55:41 PM
Creation date
9/10/2020 3:33:26 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda 09-15-20 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 09-15-20 Virtual Business Meeting
Minutes 09-15-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Minutes 09-22-2020 Continued Virtual Business Meeting from 9/15/2020
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
37 <br /> TABLE OF CONTENTS <br /> 1. OVERVIEW AND INTRODUCITON <br /> • SECTION 1-1 INTRODUCTION, PURPOSE,AND INTENT <br /> • SECTION 1-2 PROJECT SIZE AND LOCATION <br /> • SECTION 1-3 CURRENT LAND USES <br /> • SECTION 1-4 ADJACENT PROPERTY INFORMATION <br /> • SECTION 1-5 CONSTRUCTION SCHEDULE <br /> 2. LAND USE PROGRAM <br /> • SECTION 2-1 LAND USES <br /> • SECTION 2-1-1 PERMITTED LAND USES <br /> • SECTION 2-1-2 EXCLUDED LAND USES <br /> • SECTION 2-2 PERFORMANCE STANDARDS <br /> • SECTION 2-2-1 LAND USE INTENSITY <br /> • SECTION 2-2-2 ENVIRONMENTAL FACTORS <br /> • SECTION 2-2-3 GENERAL PERFORMANCE STANDARDS <br /> • Section 2-3 DESIGN CRITERIA <br /> • SECTION 2-3-1 ARCHITECTURAL DESIGN <br /> • SECTION 2-3-2 LANDSCAPING AND PRESERVATION DESIGN <br /> • SECTION 2-3-3 SIGNS AND LIGHTING <br /> • SECTION 2-3-4 SUSTAINABLE DESIGN INITIATIVES <br /> 3. TRANSPORTATION <br /> • SECTION 3-1 INTERNAL TRAFFIC CIRCULATION AND PARKING <br /> • SECTION 3-2 TIA IMPROVMENTS SUMMARY <br /> 4. UTILITIES AND OTHER PUBLIC SERVICES <br /> • SECTION 4-1 INTERNAL UTILITY DESIGN <br /> 5. OPEN SPACE <br /> • SECTION 5-1 VEGETATED BUFFERS <br /> EXHIBITS <br /> • EXHIBITA—ADJOINING PROPERTY OWNERS LIST <br /> • EXHIBIT B— FUTURE LAND USE MAP—ORANGE COUNTY COMPREHENSIVE PLAN <br /> • EXHIBIT C—TOWN OF HILLSBOROUGH/ORANGE COUNTY URBAN SERVICE BOUNDARY <br /> • EXHIBIT D—WATER AND SEWER MANAGEMENT PLANNING <br /> • EXHIBIT E—PROPERTY OWNER AUTHORIZATIONS <br /> • EXHIBIT F— MASTER SIGN PLANS <br /> • EXHIBIT G— ENVIRONMENTAL ASSESSMENT CHECKLIST AND SUPPORTING DOCUMENTATION <br /> • EXHIBIT H—TRAFFIC IMPACT ANALYSIS <br /> MAPS <br /> • EXISTING CONDITIONS MAP <br /> • ENVIRONMENTAL FEATURES MAP <br /> • PRELIMINARY SITE PLAN <br /> • WATER AND SEWER MAP <br /> • INTERNAL ROADWAY MAP <br />
The URL can be used to link to this page
Your browser does not support the video tag.