Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:55:41 PM
Creation date
9/10/2020 3:33:26 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda 09-15-20 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 09-15-20 Virtual Business Meeting
Minutes 09-15-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Minutes 09-22-2020 Continued Virtual Business Meeting from 9/15/2020
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
368 <br /> v. Sheet C-6 needs a legend detailing what the proposed <br /> landscape/buffer areas are. <br /> Further, revise the Sheet to contain the proposed planting schedule <br /> (i.e. amount of foliage for every 100 linear ft. of the Project) <br /> consistent with previous direction. Staff recommends use of a <br /> planting detail on the Sheet supporting this description and offers <br /> the following illustrative example as a guide: <br /> w IF <br /> 0EUULK:u,3I;ANQPY Ik; <br /> j EVERGREPICANCHTREE <br /> . 3C+�AAX <br /> d o 0 <br /> x <br /> 10 MAX <br /> to ' <br /> ;u <br /> EVERGREEN UNDERSTORY TREE <br /> VER(�REEN 519RUB <br /> **NOTE: not taken from County UDO. Graphic is for illustrative purposes only** <br /> i. Provide the following additional detail on Sheet C-2: <br /> 1. A typical public road access cross section detail for the <br /> individual development areas; <br /> 2. A typical interior roadway design standard (i.e. cross section) <br /> including drainage detail(s) and explanation of how drainage <br /> will be handled by interior road systems if at all; <br /> 3. If there is a proposed layout (i.e. creation of individual <br /> parcels allowing for development) please denote same on <br /> this map; <br /> 4. Provide language indicating if denoted stormwater control <br /> measures (SCMs) are: <br /> a. For illustrative purposes (i.e. final SCM location shall <br /> be determined with the submittal of a formal <br /> stormwater management plan in accordance with the <br /> UDO); <br /> b. Are anticipated to serve as master drainage basin <br /> areas or for specific `pods'. <br /> ii. Sheet C-4: Section 6.7.1 (B) (6) of the UDO requires a map <br /> detailing the utility master plan for the project (Sheet C-4). While <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.