Orange County NC Website
368 <br /> v. Sheet C-6 needs a legend detailing what the proposed <br /> landscape/buffer areas are. <br /> Further, revise the Sheet to contain the proposed planting schedule <br /> (i.e. amount of foliage for every 100 linear ft. of the Project) <br /> consistent with previous direction. Staff recommends use of a <br /> planting detail on the Sheet supporting this description and offers <br /> the following illustrative example as a guide: <br /> w IF <br /> 0EUULK:u,3I;ANQPY Ik; <br /> j EVERGREPICANCHTREE <br /> . 3C+�AAX <br /> d o 0 <br /> x <br /> 10 MAX <br /> to ' <br /> ;u <br /> EVERGREEN UNDERSTORY TREE <br /> VER(�REEN 519RUB <br /> **NOTE: not taken from County UDO. Graphic is for illustrative purposes only** <br /> i. Provide the following additional detail on Sheet C-2: <br /> 1. A typical public road access cross section detail for the <br /> individual development areas; <br /> 2. A typical interior roadway design standard (i.e. cross section) <br /> including drainage detail(s) and explanation of how drainage <br /> will be handled by interior road systems if at all; <br /> 3. If there is a proposed layout (i.e. creation of individual <br /> parcels allowing for development) please denote same on <br /> this map; <br /> 4. Provide language indicating if denoted stormwater control <br /> measures (SCMs) are: <br /> a. For illustrative purposes (i.e. final SCM location shall <br /> be determined with the submittal of a formal <br /> stormwater management plan in accordance with the <br /> UDO); <br /> b. Are anticipated to serve as master drainage basin <br /> areas or for specific `pods'. <br /> ii. Sheet C-4: Section 6.7.1 (B) (6) of the UDO requires a map <br /> detailing the utility master plan for the project (Sheet C-4). While <br /> 13 <br />