Orange County NC Website
367 <br /> Staff recommends the use of a legend indicating what these lines <br /> represent (i.e. project boundary lines, utility easements, utility <br /> service areas, rights-of-way, etc.). <br /> ii. Sheet C-2 should display the floodplain and floodplain buffer area <br /> per Section 6.13 of the UDO; <br /> iii. Sheet C-2 should display the following information: <br /> 1. Proposed floor area ratio (FAR) for the Project; <br /> 2. Proposed open space; <br /> 3. Breakdown of landscape/buffer area (i.e. acreage) for the <br /> Project; <br /> 4. Proposed setbacks (internal and external); <br /> 5. Anticipated number of parking spaces, loading berths/stalls, <br /> etc.; <br /> 6. Maximum allowable building height (in general and per each <br /> individual development `pod' if there will be a difference); <br /> 7. Anticipated number of parking spaces with access to <br /> alternative energy charging stations (if proposed); <br /> 8. Number of 'park and ride' spaces (if proposed). <br /> iv. Development of Building D appears to 'cross' an existing property <br /> line. <br /> There needs to be some explanation of boundary/development <br /> areas on the master plan set providing an explanation of what will <br /> be included within individual development areas of the Project. <br /> V. Sheet(s) C-2 and C-2.4 indicate there will be development activity <br /> occurring within an existing utility easement, specifically a power <br /> line easement. <br /> Staff requires documentation indicating either the power <br /> line/easement is being relocated or the utility provider will allow for <br /> the development of parking and structures within their easement. <br /> vi. Sheet C-6: Label and document all proposed and/or required <br /> landscape/ buffer areas for the Project including, but not limited to: <br /> 1. Perimeter buffers; <br /> 2. In-between lot/development pod landscape areas; <br /> 3. Internal landscaping (i.e. parking lot and parking lot <br /> perimeter, building, preservation of existing significant <br /> foliage, etc.); <br /> 4. Stream/floodplain buffers; <br /> 5. Major Transportation Corridor (MTC) buffers, including <br /> requested breaks consistent with Section 6.6.4 of the UDO. <br /> 12 <br />