Orange County NC Website
347 <br /> Settlers Point RTLP Proposal EDH-5 zoning <br /> (approved) <br /> 100 ft. building setback <br /> and 50 ft. parking <br /> Perimeter lot/access road setback <br /> (external to <br /> 100 ft. (non EDD zoned (western/southern N/A 4 <br /> project) property) property line) <br /> 50 ft. setback (eastern <br /> Setbacks property line) <br /> 25 ft. (Service Drive) <br /> structures: External Road 50 ft. N/A <br /> 100 ft. (Davis Road) <br /> Front 25 ft. (internal roads) Not specified 50 ft. <br /> Side 25 ft. Not specified 20 ft. <br /> Rear 25 ft. Not specified 40 ft. <br /> • 50 ft. buffer along <br /> • 100 ft. perimeter western and southern <br /> buffer; property lines; <br /> • 100 ft. perimeter buffer <br /> • 50 ft. buffer along 0 25 ft. buffer along for adjacent properties <br /> Old NC Highway 86; eastern property line; not zoned EDD; <br /> Land Use Buffers: 0 25 ft. buffer along 0 25 ft. buffer along • Buffers based on land <br /> Service Road; Service Road and use, range from 20 ft. to <br /> 30% of a buildings Davis Road; 100 ft. (Interstate <br /> perimeter shall be 0 20% of a buildings Highway— MTC buffer) <br /> landscaped. perimeter shall be <br /> landscaped. <br /> Parking based on land use— <br /> range would require: <br /> • Retail and Office: 1 <br /> space for every 200 <br /> sq.ft. gross floor area; <br /> Overall parking Overall parking standard:1 space per 750 sq.ft. of • Manufacturing: 1 <br /> Parking standard: 1 space office space and 1 space space per employee <br /> for every 300 sq.ft. of per 3,000 sq.ft. of on largest shift; <br /> building area additional indoor area. <br /> • Delivery Service: 1 <br /> space for every <br /> employee on max <br /> shift plus 1 space per <br /> 800 sq.ft. of gross <br /> floor area <br /> 4 Per Section 6.8.12 (C) of the LIDO, a 100 ft. vegetative buffer is required to be provided at the boundary of all Economic <br /> Development districts. <br />