Orange County NC Website
Attachment 5 346 <br /> Settlers Point RTLP Proposal EDH-5 zoning <br /> (approved) <br /> 195 acres (8,494,200 161 acres (7,013,160 N/A <br /> sq.ft.) as follows: sq.ft.) of property. <br /> Project Size • District 1: 149 acres <br /> • District 2: 46 acres (+/- <br /> • District 1: 1,248,000 2,250,000 sq.ft. of building 0.65 or 28,314 sq.ft. of floor <br /> sq.ft. of building area— area proposed—roughly area per acre of property. <br /> Floor Area Ratio (FAR)— roughly 8,375 sq.ft. of 14,000 sq.ft. of floor area <br /> the maximum floor area floor area per acre. per acre. <br /> permitted for each square e District 2: 261,800 <br /> foot of land area sq.ft. of building area— <br /> roughly 5,700 sq.ft. of <br /> floor area per acre. <br /> Minimum Open Space Ratio <br /> Minimum Required Open 81.6 acres (30% of 41 acres (25% of project). of 0.40 or 17,424 sq.ft. of <br /> Space project). open space area per acre of <br /> property3 <br /> Pedestrian paths Pedestrian paths 0.05 or 2,178 sq.ft. of <br /> Minimum Required developed throughout the developed throughout the pedestrian access and/or <br /> Pedestrian/Landscape Ratio project—required project—required landscaped area per acre of <br /> - landscaping part of open landscaping part of open property. <br /> space. space. <br /> 40 ft. (additional height <br /> Maximum Allowable Height 60 ft. 60 ft. allowed with increased front <br /> and side yard setbacks—up <br /> to 60 ft.) <br /> Project approval indicated Applicant indicates Project <br /> compliance with will comply with applicably <br /> applicable County County standards detailed <br /> Stormwater standards detailed in in Section 6.14 of the Compliance with UDO <br /> Section 6.14 of the UDO. UDO. This would include required. <br /> This would include compliance with nutrient <br /> compliance with nutrient reduction standards. <br /> reduction standards. <br /> Erosion Control County standards County standards Compliance with UDO <br /> (Section 6.15) (Section 6.15) required. <br /> 1 Properties were previously zoned EDH-5. Staff is including standards for this district to aid comparing allowable <br /> intensity of development. <br /> 2 This included property east of Old NC Highway 86 in what was District 2. <br /> 3 Per the Article 10 Definitions of the UDO,the open space ration area includes:parking and vehicular access areas and it can <br /> also include balconies,and roofs improved for recreation. <br />