Orange County NC Website
310 <br /> Hillsborough Industrial Site 2023 Build-Improved PM <br /> PM Peak <br /> Summary of All Intervals <br /> Run Number 1 10 2 3 4 5 6 <br /> Start Time 3:50 3:50 3:50 3:50 3:50 3:50 3:50 <br /> End Time 5:00 5:00 5:00 5:00 5:00 5:00 5:00 <br /> Total Time(min) 70 70 70 70 70 70 70 <br /> Time Recorded(min) 60 60 60 60 60 60 60 <br /> #of Intervals 5 5 5 5 5 5 5 <br /> #of Recorded Intervals 4 4 4 4 4 4 4 <br /> Vehs Entered 3355 3229 3287 3247 3278 3204 3244 <br /> Vehs Exited 3348 3190 3300 3256 3238 3164 3248 <br /> Starting Vehs 132 120 120 139 126 127 123 <br /> Ending Vehs 139 159 107 130 166 167 119 <br /> Travel Distance(mi) 2881 2776 2885 2833 2833 2800 2820 <br /> Travel Time(hr) 158.8 135.0 134.0 132.8 134.2 153.1 133.4 <br /> Total Delay(hr) 75.2 54.5 50.6 50.8 51.7 72.0 51.9 <br /> Total Stops 3849 3626 3586 3596 3602 3764 3565 <br /> Fuel Used(gal) 114.5 106.5 110.0 107.2 107.9 111.3 107.5 <br /> Summary of All Intervals <br /> Run Number 7 8 9 Avg <br /> Start Time 3:50 3:50 3:50 3:50 <br /> End Time 5:00 5:00 5:00 5:00 <br /> Total Time(min) 70 70 70 70 <br /> Time Recorded(min) 60 60 60 60 <br /> #of Intervals 5 5 5 5 <br /> #of Recorded Intervals 4 4 4 4 <br /> Vehs Entered 3315 3226 3253 3262 <br /> Vehs Exited 3301 3238 3217 3250 <br /> Starting Vehs 122 131 118 120 <br /> Ending Vehs 136 119 154 137 <br /> Travel Distance(mi) 2895 2842 2800 2836 <br /> Travel Time(hr) 152.7 130.8 145.4 141.0 <br /> Total Delay(hr) 68.8 48.4 64.2 58.8 <br /> Total Stops 3899 3521 3702 3668 <br /> Fuel Used(gal) 114.2 107.4 109.5 109.6 <br /> Interval #0 Information Seeding <br /> Start Time 3:50 <br /> End Time 4:00 <br /> Total Time(min) 10 <br /> No data recorded this interval. <br /> SimTraffic Simulation Summary SimTraffic Report <br /> Stantec Page 1 <br />