Orange County NC Website
306 <br /> Hillsborough Industrial Site 2023 Build-Improved AM <br /> AM Peak <br /> Interval #4 Information Recover <br /> Start Time 7:45 <br /> End Time 8:00 <br /> Total Time(min) 15 <br /> Volumes adjusted by Anti PHF. <br /> Run Number 1 10 2 3 4 5 6 <br /> Vehs Entered 794 772 786 801 825 804 801 <br /> Vehs Exited 818 820 782 810 791 799 801 <br /> Starting Vehs 192 187 106 165 132 140 144 <br /> Ending Vehs 168 139 110 156 166 145 144 <br /> Travel Distance(mi) 684 680 679 688 679 681 681 <br /> Travel Time(hr) 45.9 39.0 32.3 45.3 33.1 33.2 37.9 <br /> Total Delay(hr) 26.3 19.4 12.8 25.4 13.3 13.6 18.2 <br /> Total Stops 1037 891 840 1013 900 892 950 <br /> Fuel Used(gal) 29.4 27.7 25.8 28.9 26.0 26.3 27.3 <br /> Interval #4 Information Recover <br /> Start Time 7:45 <br /> End Time 8:00 <br /> Total Time(min) 15 <br /> Volumes adjusted by Anti PHF. <br /> 7 8 9 Avg <br /> Vehs Entered 805 826 879 805 <br /> Vehs Exited 846 824 820 811 <br /> Starting Vehs 162 160 141 146 <br /> Ending Vehs 121 162 200 149 <br /> Travel Distance(mi) 689 696 721 688 <br /> Travel Time(hr) 37.9 42.2 41.5 38.8 <br /> Total Delay(hr) 17.8 22.2 20.8 19.0 <br /> Total Stops 979 931 1010 942 <br /> Fuel Used(gal) 27.6 28.8 28.9 27.7 <br /> SimTraffic Simulation Summary SimTraffic Report <br /> Stantec Page 5 <br />