Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:55:41 PM
Creation date
9/10/2020 3:33:26 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda 09-15-20 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 09-15-20 Virtual Business Meeting
Minutes 09-15-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Minutes 09-22-2020 Continued Virtual Business Meeting from 9/15/2020
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
296 <br /> Hillsborough Industrial Site 2023 Build-Improved PM <br /> 140: Old NC 86 & Davis Road II Timing Plan: PM Peak <br /> t t <br /> Lane Group EBL EBR NBL NBT SBT SBR <br /> Lane Configurations y +' <br /> Traffic Volume(vph) 115 39 45 367 312 153 <br /> Future Volume(vph) 115 39 45 367 312 153 <br /> Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 <br /> Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Frt 0.966 0.956 <br /> Flt Protected 0.964 0.995 <br /> Satd. Flow(prot) 1735 0 0 1853 1781 0 <br /> Flt Permitted 0.964 0.912 <br /> Satd. Flow(perm) 1735 0 0 1699 1781 0 <br /> Right Turn on Red No No <br /> Satd. Flow(RTOR) <br /> Link Speed (mph) 45 45 45 <br /> Link Distance(ft) 1029 1406 754 <br /> Travel Time(s) 15.6 21.3 11.4 <br /> Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 <br /> Adj. Flow(vph) 128 43 50 408 347 170 <br /> Shared Lane Traffic(%) <br /> Lane Group Flow(vph) 171 0 0 458 517 0 <br /> Turn Type Prot Perm NA NA <br /> Protected Phases 4 2 6 <br /> Permitted Phases 2 <br /> Detector Phase 4 2 2 6 <br /> Switch Phase <br /> Minimum Initial(s) 7.0 12.0 12.0 12.0 <br /> Minimum Split(s) 25.0 25.0 25.0 25.0 <br /> Total Split(s) 25.0 35.0 35.0 35.0 <br /> Total Split(%) 41.7% 58.3% 58.3% 58.3% <br /> Maximum Green(s) 18.0 28.0 28.0 28.0 <br /> Yellow Time(s) 5.0 5.0 5.0 5.0 <br /> All-Red Time(s) 2.0 2.0 2.0 2.0 <br /> Lost Time Adjust(s) -2.0 -2.0 -2.0 <br /> Total Lost Time(s) 5.0 5.0 5.0 <br /> Lead/Lag <br /> Lead-Lag Optimize? <br /> Vehicle Extension(s) 3.0 3.0 3.0 3.0 <br /> Recall Mode None C-Min C-Min C-Min <br /> Walk Time(s) 7.0 7.0 7.0 7.0 <br /> Flash Dont Walk(s) 11.0 11.0 11.0 11.0 <br /> Pedestrian Calls(#/hr) 0 0 0 0 <br /> Act Effct Green(s) 13.2 40.6 40.6 <br /> Actuated g/C Ratio 0.22 0.68 0.68 <br /> v/c Ratio 0.45 0.40 0.43 <br /> Control Delay 23.3 7.9 6.1 <br /> Queue Delay 0.0 0.0 0.0 <br /> Total Delay 23.3 7.9 6.1 <br /> LOS C A A <br /> Approach Delay 23.3 7.9 6.1 <br /> Approach LOS C A A <br /> Lanes,Volumes,Timings Synchro 10 Report <br /> Stantec Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.