Orange County NC Website
276 <br /> Hillsborough Industrial Site 2023 Build PM <br /> 170: Warehouse C Dvwy & Service Road Timing Plan: PM Peak <br /> Intersection <br /> Int Delay,s/veh 2.1 <br /> Movement EBT EBR WBL WBT NBL NBR <br /> Lane Configurations 1� 4 Y <br /> Traffic Vol,veh/h 129 4 14 48 4 38 <br /> Future Vol,veh/h 129 4 14 48 4 38 <br /> Conflicting Peds,#/hr 0 0 0 0 0 0 <br /> Sign Control Free Free Free Free Stop Stop <br /> RT Channelized None - None - None <br /> Storage Length - - 0 <br /> Veh in Median Storage,# 0 - 0 0 <br /> Grade, % 0 0 0 <br /> Peak Hour Factor 90 90 90 90 90 90 <br /> Heavy Vehicles, % 2 2 2 2 2 2 <br /> Mvmt Flow 143 4 16 53 4 42 <br /> Major/Minor Major1 Major2 Minor1 <br /> Conflicting Flow All 0 0 147 0 230 145 <br /> Stage 1 - - - - 145 - <br /> Stage 2 - 85 - <br /> Critical Hdwy 4.12 6.42 6.22 <br /> Critical Hdwy Stg 1 - 5.42 - <br /> Critical Hdwy Stg 2 - 5.42 - <br /> Follow-up Hdwy 2.218 3.518 3.318 <br /> Pot Cap-1 Maneuver 1435 758 902 <br /> Stage 1 - 882 - <br /> Stage 2 - 938 - <br /> Platoon blocked,% <br /> Mov Cap-1 Maneuver 1435 750 902 <br /> Mov Cap-2 Maneuver - 750 - <br /> Stage 1 - 882 <br /> Stage 2 - 928 <br /> Approach EB WB NB <br /> HCM Control Delay,s 0 1.7 9.3 <br /> HCM LOS A <br /> Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT <br /> Capacity(veh/h) 885 - 1435 <br /> HCM Lane V/C Ratio 0.053 - 0.011 <br /> HCM Control Delay(s) 9.3 - 7.5 0 <br /> HCM Lane LOS A - A A <br /> HCM 95th%tile Q(veh) 0.2 - 0 - <br /> HCM 6th TWSC Synchro 10 Report <br /> Stantec Page 7 <br />