Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:55:41 PM
Creation date
9/10/2020 3:33:26 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda 09-15-20 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 09-15-20 Virtual Business Meeting
Minutes 09-15-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Minutes 09-22-2020 Continued Virtual Business Meeting from 9/15/2020
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
264 <br /> Hillsborough Industrial Site 2023 Build AM <br /> 150: Warehouse A Dvwy & Service Road Timing Plan:AM Peak <br /> Intersection <br /> Int Delay,s/veh 1.7 <br /> Movement EBKEBR NBL NBT SBT SBR <br /> Lane Configurations Y 4 <br /> Traffic Vol,vehlh 18 4 4 11 37 59 <br /> Future Vol,veh/h 18 4 4 11 37 59 <br /> Conflicting Peds,#/hr 0 0 0 0 0 0 <br /> Sign Control Stop Stop Free Free Free Free <br /> RT Channelized - None None None <br /> Storage Length 0 - - - <br /> Veh in Median Storage,# 0 - - 0 0 - <br /> Grade, % 0 - - 0 0 - <br /> Peak Hour Factor 90 90 90 90 90 90 <br /> Heavy Vehicles, % 2 2 2 2 2 2 <br /> Mvmt Flow 20 4 4 12 41 66 <br /> Major/Minor Minor2 Majorl Majo <br /> Conflicting Flow All 94 74 107 0 - 0 <br /> -Stage 1 74 - - - - - <br /> Stage 2 20 - - - <br /> Critical Hdwy 6.42 6.22 4.12 - <br /> Critical Hdwy Stg 1 5.42 - - - <br /> Critical Hdwy Stg 2 5.42 - - - <br /> Follow-up Hdwy 3.518 3.318 2.218 <br /> Pot Cap-1 Maneuver 906 988 1484 <br /> Stage 1 949 - - - <br /> Stage 2 1003 - - - - <br /> Platoon blocked,% - <br /> Mov Cap-1 Maneuver 903 988 1484 - - - <br /> Mov Cap-2 Maneuver 903 - - - <br /> Stage 1 946 - - - - <br /> Stage 2 1003 - - <br /> EB NB SIB <br /> HCM Control Delay,s 9 2 0 <br /> HCM LOS A <br /> Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR <br /> Capacity(vehlh) 1484 917 <br /> HCM Lane V/C Ratio 0.003 - 0.027 <br /> HCM Control Delay(s) — 9 <br /> HCM Lane LOS A A A <br /> HCM 95th%tile Q(veh) 0.1 <br /> HCM 6th TWSC Synchro 10 Report <br /> Stantec Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.