Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:55:41 PM
Creation date
9/10/2020 3:33:26 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda 09-15-20 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 09-15-20 Virtual Business Meeting
Minutes 09-15-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Minutes 09-22-2020 Continued Virtual Business Meeting from 9/15/2020
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
259 <br /> Hillsborough Industrial Site 2023 Build AM <br /> 100: Old NC 86 & Rippy Lane/Waterstone Drive Timing Plan:AM Peak <br /> -11 --1, 4--- t t <br /> Lane Group EBL EBT EBR WBL WB=WBR NBL NBT NBR SBL SR�R <br /> LOS D E E A C C A D A <br /> Approach Delay 43.5 29.6 14.4 23.1 <br /> Approach LOS D M B C <br /> Queue Length 50th(ft) 6 112 111 0 2 143 0 177 93 <br /> Queue Length 95th(ft) 184 183 35 11 260 49 220 196 <br /> Internal Link Dist(ft) 933 1361 1030 1228 <br /> Turn Bay Length(ft) 25 300 <br /> Base Capacity(vph) 248 299 300 804 298 1668 1244 754 2531 <br /> Starvation Cap Reductn 0 0 _ 0 0 0 <br /> Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 <br /> Storage Cap Reductn 0 wmm 0 0 0 <br /> Reduced v/c Ratio 0.05 0.50 0.49 0.36 0.01 0.36 0.39 0.63 0.33 <br /> Intersection Summary <br /> Area Type: Other <br /> Cycle Length: 120 <br /> Actuated Cycle Length: 120 <br /> Offset:0(0%), Referenced to phase 2:NBTL and 6:SBT,Start of Green <br /> Natural Cycle:80 <br /> Control Type:Actuated-Coordinated <br /> Maximum v/c Ratio:0.69 <br /> Intersection Signal Delay:21.3 Intersection LOS:C <br /> Intersection Capacity Utilization 57.6% ICU Level of Service B <br /> Analysis Period(min) 15 <br /> Splits and Phases: 100: Old NC 86&Rippy Lane/Waterstone Drive <br /> 01 42 <br /> 1 26S c4[ <br /> T 06 11 <br /> Lanes,Volumes,Timings Synchro 10 Report <br /> Stantec Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.