Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:55:41 PM
Creation date
9/10/2020 3:33:26 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda 09-15-20 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 09-15-20 Virtual Business Meeting
Minutes 09-15-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Minutes 09-22-2020 Continued Virtual Business Meeting from 9/15/2020
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
254 <br /> Hillsborough Industrial Site 2020 Existing PM <br /> 110: Old NC 86 & 1-40 WB Ramp Timing Plan: PM Peak <br /> Intersection <br /> Int Delay,s/veh 1.6 <br /> Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br /> Lane Configurations +' r t tT+ <br /> Traffic Vol,veh/h 0 0 0 43 4 407 82 323 0 0 639 76 <br /> Future Vol,veh/h 0 0 0 43 4 407 82 323 0 0 639 76 <br /> Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 0 0 0 0 <br /> Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free <br /> RT Channelized None - - Free - None - None <br /> Storage Length - 225 - 0 225 - - <br /> Veh in Median Storage,# 2 - - 0 - - 0 0 <br /> Grade, % 0 - - 0 - - 0 0 <br /> Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 <br /> Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 <br /> Mvmt Flow 0 0 0 48 4 452 91 359 0 0 710 84 <br /> Major/Minor Minor1 Major1 Major2 <br /> Conflicting Flow All 896 1335 - 794 0 - 0 <br /> Stage 1 541 541 - - - <br /> Stage 2 355 794 - - - <br /> Critical Hdwy 6.63 6.53 4.13 - - <br /> Critical Hdwy Stg 1 5.43 5.53 - - <br /> Critical Hdwy Stg 2 5.83 5.53 - - - - <br /> Follow-up Hdwy 3.519 4.019 2.219 - - <br /> Pot Cap-1 Maneuver 295 153 0 825 0 0 <br /> Stage 1 582 520 0 - 0 0 - <br /> Stage 2 681 399 0 - 0 0 - <br /> Platoon blocked,% <br /> Mov Cap-1 Maneuver 263 0 - 825 - - - <br /> Mov Cap-2 Maneuver 263 0 - <br /> Stage 1 518 0 - - - - <br /> Stage 2 681 0 - - <br /> Approach WB NB SIB <br /> HCM Control Delay,s 22 2 0 <br /> HCM LOS C <br /> Minor Lane/Major Mvmt NBL NBTWBLn1WBLn2 SBT SBR <br /> Capacity(veh/h) 825 - 263 - - <br /> HCM Lane V/C Ratio 0.11 - 0.199 - - <br /> HCM Control Delay(s) 9.9 - 22 0 - <br /> HCM Lane LOS A - C A - <br /> HCM 95th%tile Q(veh) 0.4 - 0.7 - - <br /> HCM 6th TWSC Synchro 10 Report <br /> Stantec Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.