Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:55:41 PM
Creation date
9/10/2020 3:33:26 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda 09-15-20 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 09-15-20 Virtual Business Meeting
Minutes 09-15-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Minutes 09-22-2020 Continued Virtual Business Meeting from 9/15/2020
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
247 <br /> Hillsborough Industrial Site 2020 Existing AM <br /> 100: Old NC 86 & Rippy Lane/Waterstone Drive Timing Plan:AM Peak <br /> -11 --1, 4--- t t <br /> Lane Group EBL EBT EBR WBL WBT NBT NBR SBL SBT SBR <br /> Queue Length 50th(ft) 6 49 48 84 0 93 50 <br /> Queue Length 95th(ft) 26 93 93 38 9 181 28 130 142 <br /> Internal Link Dist(ft) 933 1361 30 1228 <br /> Turn Bay Length(ft) 300 200 425 300 <br /> Base Capacity(vph) 361 392 394 559 429 2096 1403 503 2709 <br /> Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 <br /> Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 <br /> Storage Cap Reductn 0 0 0 0 0 0 0 0 0 <br /> Reduced v/c Ratio 0.03 0.16 0.16 0.31 0.01 0.25 0.16 0.49 0.26 <br /> Intersection Summary IL 'qqw <br /> Area Type: Other <br /> Cycle Length: 120 <br /> Actuated Cycle Length: 120 <br /> Offset:0(0%), Referenced to phase 2:NBTL and 6:SBT,Start of Green <br /> Natural Cycle:90 <br /> Control Type:Actuated-Coordinated <br /> Maximum v/c Ratio:0.54 <br /> Intersection Signal Delay: 16.4 Intersection LOS: B <br /> Intersection Capacity Utilization 47.5% ICU Level of Service A <br /> Analysis Period(min) 15 <br /> Splits and Phases: 100: Old NC 86&Rippy Lane/Waterstone Drive <br /> I 01 0 Vf O3 4 <br /> T 0=6 <br /> Lanes,Volumes,Timings Synchro 10 Report <br /> Stantec Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.