Orange County NC Website
241 <br /> Research Triangle Logistics Park:Traffic Volume Calculations Waterstone Trips RTLP Site Trips <br /> Prev.Study Approved <br /> Volumes Existing Historical Growth Background Historical Growth Development No-Build Primary Trip Primary Trip Build <br /> (2016) (2020) (2016-2020) (2023) (2020-2023) Trips (2023) Distribution Assignment (2023) <br /> AM PM AM PM AM PM AM PM AM PM AM PM AM PM Enter Exit AM PM AM PM <br /> Intersection 1 -Old NC 86 at Waterstone Drive/Rippy Lane <br /> EBL 4 4 4 4 0 0 4 4 0 0 4 4 0 0 4 4 <br /> EBT 4 4 4 4 0 0 4 4 0 0 4 4 0 0 4 4 <br /> EBR 4 4 4 4 0 0 4 4 0 0 4 4 0 0 4 4 <br /> WBL 107 168 111 175 4 7 114 180 3 5 138 208 252 388 5% 12 4 264 392 <br /> WBT 4 4 4 4 0 0 4 4 0 0 4 4 0 0 4 4 <br /> WB R 150 160 156 166 6 6 161 171 5 5 100 161 261 332 0 0 261 332 <br /> NBL 4 4 4 4 0 0 4 4 0 0 4 4 0 0 4 4 <br /> NBT 462 567 481 590 19 23 496 608 15 18 36 93 532 701 20°% 15 48 547 749 <br /> NBR 196 130 204 135 8 5 210 139 6 4 223 175 433 314 5°% 4 12 437 326 <br /> SBL 212 96 221 100 9 4 228 103 7 3 201 137 429 240 0 0 429 240 <br /> SBT 595 515 619 536 24 21 638 552 19 16 54 61 692 613 20% 49 18 741 631 <br /> SBR 1 4 4 1 4 4 0 0 4 4 0 0 1 4 4 1 1 0 0 4 4 <br /> Intersection 2-Old NC 86 at 1-40 WB On/Off Ramps <br /> WBL 17 41 18 43 1 2 19 44 1 1 19 44 30% 74 26 93 70 <br /> WBT 4 4 4 4 0 0 4 4 0 0 4 4 0 0 4 4 <br /> WBR 294 391 306 407 12 16 315 419 9 12 155 161 470 580 0 0 470 580 <br /> NBL 70 79 73 82 3 3 75 84 2 2 75 84 25% 18 60 93 144 <br /> NBT 368 310 383 323 15 13 395 333 12 10 104 107 499 440 25% 18 60 517 500 <br /> SBT 671 614 698 639 27 25 719 658 21 19 134 188 853 846 25% 62 22 915 868 <br /> SBR 1 35 73 1 36 76 1 1 3 1 37 78 1 1 2 1 58 81 1 95 159 1 1 0 0 1 95 159 <br /> Intersection 3-Old NC 86 at 1-40 EB On/Off Ramps <br /> EBL 74 38 77 40 3 2 79 41 2 1 78 80 157 121 0 0 157 121 <br /> EBT 4 4 4 4 0 0 4 4 0 0 4 4 0 0 4 4 <br /> EBR 85 41 88 43 3 2 91 44 3 1 91 44 25% 62 22 153 66 <br /> NBT 364 351 379 365 15 14 390 376 11 11 26 27 416 403 50% 37 119 453 522 <br /> NBR 72 19 75 20 3 1 77 21 2 1 77 21 30% 22 71 99 92 <br /> SBL 481 327 501 340 20 13 516 350 15 10 115 161 631 511 0 0 631 511 <br /> SBT 1 207 328 1 215 341 1 8 13 1 222 351 1 7 10 1 19 27 1 241 378 1 55% 1 136 48 1 377 426 <br /> Research Triangle Logistics Park TIA Traffic Volume Calculations w-driveways.xlsm <br /> Stantec 1 of 3 <br />