Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:55:41 PM
Creation date
9/10/2020 3:33:26 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda 09-15-20 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 09-15-20 Virtual Business Meeting
Minutes 09-15-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Minutes 09-22-2020 Continued Virtual Business Meeting from 9/15/2020
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N ��SoaTF NCDOT TIA Scoping Checklist ���R.k <br /> :�1 <br /> " TIA Need ® i TIA <br /> Screening Submittal � <br /> Agreement by All Parties <br /> The undersigned agree to the contents and methodology described above for completing the required traffic <br /> impact analysis for the proposed development identified herein. Any changes to the above methodology <br /> contemplated by the Applicant or the TIA Consultant must be submitted to the District Engineer in writing. <br /> If approved by NCDOT,then such changes may be accepted for the TIA report. Subsequent revisions to the <br /> development plan(e.g.land use,density,site access,or schedule)may require additional Scoping and analysis, <br /> and may modify the TIA requirements. <br /> This agreement shall become effective on the date approved by NCDOT, and shall expire months after <br /> the effective date or upon significant changes to the roadway network and/or development assumptions, <br /> whichever occurs first. Once expired,renewal or re-scoping will be required for subsequent TIA submittals. <br /> APPLICANT <br /> Frank Csapo <br /> Signature Print Name Date <br /> TIA CONSULTANT <br /> Matt Peach,PE,PTOE 5/28/2020 <br /> Signature Print Name Date <br /> LOCAL GOVERNMENT REPRESENTATIVE (If Applicable) <br /> Signature Print Name Date <br /> Email concurrence may be used in lieu of the signature. <br /> NCDOT DISTRICT REPRESENTATIVE <br /> Reviewed and approved by the NCDOT Division 7 District 1 on <br /> Docu Signed by: <br /> G. N. f�warrjs Jr. , Pf <br /> C60668060F9M58... <br /> Signature Print Name <br /> Email concurrence may be used in lieu of the signature. <br /> Effective Date: 10/01/2017 (Version 17-721) Page 7 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.