Orange County NC Website
N ��SoaTF NCDOT TIA Scoping Checklist ��NORrk <br /> W <br /> TIA Need ® TIA <br /> Screening Submittal � <br /> }q+N'' <br /> ® Future Year Conditions <br /> © Project Build-Out Year: 2023 <br /> ❑ Future Analysis Year(s): <br /> Z Identify below any funded/committed future transportation improvements, as well as any approved <br /> but incomplete developments near the site. <br /> Funded STIP 1 Local CIP Project Description Year Complete <br /> Project <br /> U-5845 Churton Street Widening 2025 <br /> I-3306A I-40 Widening 2023 <br /> Nearby Approved Future Land Use <br /> Development Location (exclude any completed phases) Committed Improvements <br /> Waterstone Waterstone Drive Mixed-Use None <br /> X❑ Annual Growth Factor: 1 % <br /> Justification/Data Source: Growth rate from prev. Settler's Pointe TIA <br /> ® Local Comprehensive Transportation Plan Compliance <br /> © Identify Applicable Local Transportation Planning Documents <br /> Plan Hillsborough 2040 <br /> ❑ Identify Applicable Roadways inside the Study Area <br /> Speed Proposed Affect Study <br /> Road Name Classification Limit Proposed Cross-Section Right-of-Way Compliance Requirements Intersection# <br /> Effective Date: 10/01/2017 (Version 17-721) Page 5 of 7 <br />