Orange County NC Website
noRrk <br /> N ��SoaTF NCDOT TIA Scoping Checklist <br /> TIA Need TIA <br /> Screening ' Submittal ' <br /> ® Trip Distribution <br /> ❑X Trip distribution diagrams are submitted concurrently with this document(attach separate sheets). <br /> ❑ Trip distribution diagrams will be submitted separately, along with supporting information,to the <br /> District Engineer for review and approval prior to capacity analysis. The trip distribution shall be <br /> based on the current and anticipated traffic patterns, as well as instructions noted below. <br /> If required by the District Engineer,the following additional diagrams shall also be submitted: <br /> ❑ Mixed-Use Developments(separate diagrams for residential, commercial,and office trips) <br /> ❑ Inter-Development Trips (if`internal"trips cross public streets) <br /> ❑ Pass-By Trips <br /> ❑ Diverted Trips <br /> ❑ Each Analysis Period <br /> ❑ Mode Split <br /> ❑ Provide Data Source and Justification <br /> Mode <br /> Auto <br /> Period <br /> AM Peak % % % <br /> PM Peak % % % <br /> Daily % % % <br /> % <br /> ❑ Identify proper infrastructure and accommodation for other modes of travel. <br /> ® Analysis Peak Periods: <br /> Weekday AM Peak 6:30-9:30 AM <br /> ❑X Weekday PM Peak 3:30-6:30 PM <br /> ❑ Weekday Midday Peak <br /> ❑ Weekday PM School Peak <br /> ❑ Weekend Peak <br /> ❑ Other <br /> Effective Date: 10/01/2017 (Version 17-721) Page 3 of 7 <br />