Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:55:41 PM
Creation date
9/10/2020 3:33:26 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda 09-15-20 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 09-15-20 Virtual Business Meeting
Minutes 09-15-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Minutes 09-22-2020 Continued Virtual Business Meeting from 9/15/2020
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N ��SoaTF NCDOT TIA Scoping Checklist <br /> W <br /> TIA Need I TIA <br /> Screening Submittal <br /> �:Mv I--————� ^orTR. <br /> ® Trip Generation <br /> The TIA Consultant shall prepare trip generation estimates following the current NCDOT Congestion <br /> Management Capacity Analysis Guidelines, and submit the calculation sheets and supporting information <br /> to the District Engineer for approval prior to capacity analysis. <br /> ITE Proposed Land Use Size Unit Daily Trips Peak Hour AM Peak Hour Trips PM Peak Hour Trips Data Source <br /> ILUC I Type Enter Exit Total Enter Exit Total <br /> 150 Warehouse 2251200 sf 3648 Adj.Street 247 73 320 88 238 326 ITE Equation <br /> Unadjusted Site Trips 3648 247 73 320 88 238 326 <br /> Internal Capture Trips(Attach Calculation Sheets) 0 0 0 0 I 0 0 0 <br /> Internal Capture%of Unadjusted Site Trips 0% 0% 0% <br /> LUC Proposed Land Use Any Internal Trips? Pass-By%of External Trips <br /> 150 Warehouse Not Applicable 0% 0% 0% <br /> 0% 0% 0% <br /> 0% 0% 0% <br /> Yes-Adjust External Trips 0% 0% 0% <br /> Not Applicable 0% 0% 0% <br /> Pass-By Trips(Attach Calculation Sheets) 0 0 0 0 0 0 0 <br /> Adjacent Street Volumes 0 0 0 <br /> Non-Pass-By Primary Trips 3648 247 73 320 88 238 326 <br /> Diverted Trips,if Applicable and Justifiable <br /> "Explain local or other data sources, if used: <br /> ❑ Existing Site Trip Information for Redevelopment Projects(Attach separate sheets as needed) <br /> ITE Existing Land Use Size Unit Daily Trips Peak Hour AM Peak Hour Trips PM Peak Hour Trips Data Source <br /> LUC Type Enter Exit Total Enter Exit Total <br /> Please Select Please Select <br /> Total Existing Site Trips <br /> Effective Date: 10/01/2017 (Version 17-721) Page 2 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.