Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:55:41 PM
Creation date
9/10/2020 3:33:26 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda 09-15-20 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 09-15-20 Virtual Business Meeting
Minutes 09-15-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Minutes 09-22-2020 Continued Virtual Business Meeting from 9/15/2020
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�trc5ra7E, noRrk <br /> " NCDOT Traffic Impact Analysis Need Screening / Scoping Request <br /> i..--. TIA i i TIA i <br /> yo , _Scoping_i _Submittal_ OFTR. <br /> ❑ The proposed site access is located within 1,000 feet of an interchange. <br /> ❑ The Applicant requests for a new or modified control-of-access break. <br /> ❑ The Applicant requests for a new or modified median break. <br /> Frank Csapo <br /> Applicant's Signature Print Name Date <br /> Site PlanNicinity Map Requirement for TIA Need Screening: While the site plan may not be finalized <br /> during the TIA Scoping stage, the graphic representation of the proposed development shall provide <br /> adequate details on the development scope and context. More specifically, the site plan/map shall clearly <br /> show the location and type of each access point, spacing to adjacent and opposing driveways or <br /> intersections,internal street network,proposed buildings/parcels with their anticipated uses and sizes at full <br /> build-out and, if applicable,any nearby interstate,US,NC or Secondary Roads(SR). <br /> Project Name: Hillsborough Industrial Site Project Reference Number: <br /> ® A TIA is Required by the Local Government.In addition,the study area is expected to include <br /> NCDOT maintained transportation facilities. <br /> ® A TIA is Required by NCDOT,per the Policy on Street and Driveway Access to North Carolina Highway. <br /> If either or both of the boxes above are checked,the Applicant/TIA Consultant is hereby requested to <br /> fill out as much as possible of the following TIA Scoping checklist, and return it along with the <br /> supporting documents to NCDOT prior to the Scoping meeting. <br /> ❑ A TIA is NOT required. This decision is based on the development information presented above. <br /> Changes in the development plan will require re-evaluation of the TIA need,and may necessitate a TIA. <br /> The Applicant should inform the District Engineer of any significant changes in a timely fashion to avoid <br /> delays or rejections of the driveway permit/encroachment agreement applications. <br /> Effective Date: 10/01/2017 (Version 17-721) Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.