Orange County NC Website
�trc5ra7E�. noRrk <br /> " NCDOT Traffic Impact Analysis Need Screening / Scoping Request <br /> i..--. TIA i i TIA i <br /> µ, Scoping i I Submittal—— <br /> ---— ——--—— Or TR. <br /> A Traffic Impact Analysis (TIA) may be required for developments based on the site trip generation <br /> estimates, site context, or at the discretion of the NCDOT District Engineer. The Applicant or the TIA <br /> Consultant shall submit this form along with the site plan to the District Engineer to determine the TIA <br /> need and, if a TIA is required, initiate the TIA Scoping process. Without an approved scope, the TIA is <br /> incomplete and will be rejected until the study is revised to conform to NCDOT's TIA requirements. <br /> Project Name: Hillsborough Industrial Site Previous Name: If Applicable Settler's Pointe TIA <br /> Location: Hillsborough,NC County: Orange Municipality:Hillsboroug <br /> Project Description: A.K.A. Research Triangle Logistics Park. <br /> Greenfield development consisting of four warehouse buildings on one site <br /> Project Contact: Applicant TIA Consultant <br /> Company Name Barrister Commercial Group Stantec <br /> Contact Person Frank Csapo Matt Peach,PE,PTOE <br /> Phone Number 502-412-2800 919-865-7375 <br /> Email FCsapo@barristercg.com matt.peach@stantec.com <br /> Mailing Address 3810 Springhurst Boulevard, Suite 120 801 Jones Franklin Road, Suite 300 <br /> Louisville,Kentucky 40241 Raleigh,NC 27606 <br /> Site Plan Prepared By: Kimley-Horn&Associates Site Plan Date: 4/28/2020 <br /> See site plan/vicinity map requirements on page 2. <br /> Parcel Size: 181.5 Acre(s) Anticipated Build-Out Year: 2023 <br /> Weekday Site Trip Generation-Do NOT adjust for mode split, pass-by, internal capture,or diverted trips. <br /> ITE Proposed Land Use Size Unit Daily Trips Peak Hour AM Peak Hour Trips PM Peak Hour Trips Data <br /> LUC Type Enter Exit Total Enter Exit Total Source <br /> 150 Warehouse 2251200 sf 3648 Adj.Street 247 73 320 88 238 326 ITE Equation <br /> Total 122512001 sf 1 3648 1 247 1 73 1 320 1 88 1 238 1 326 <br /> Refer to the current NCDOT Congestion Management Capacity Analysis Guidelines for acceptable trip calculation methods and data sources. <br /> "Explain local or other data sources,if used: <br /> ❑X The estimated site trips meet NCDOT's TIA trip threshold of 3,000 daily trips. <br /> ❑X The estimated site trips meet the municipal TIA trip threshold of 800 trips per day <br /> ❑ This project is located in a known STIP and/or local CIP project# <br /> ❑X This project includes a rezoning request. <br /> Effective Date: 10/01/2017 (Version 17-721) Page 1 of 2 <br />