Orange County NC Website
150 <br /> RESEARCH TRIANGLE LOGISTICS PARK TRAFFIC IMPACT ANALYSIS <br /> Capacity Analysis <br /> June 4, 2020 <br /> 6.3 2023 BUILD CAPACITY ANALYSIS <br /> As a result of the 2023 Build analysis, all intersections are expected to operate at LOS C or better in both peak <br /> periods,with a few exceptions.Those are as follows: <br /> • The westbound approach to the intersection of Old NC 86 at 1-40 westbound ramps in both peak hours; <br /> • The eastbound approach to the intersection of Old NC 86 at 1-40 eastbound ramps in both peak hours; and <br /> • The eastbound approach to the intersection of Old NC 86 at the Service Road in the PM peak hour. <br /> The build level of service and delay is listed in Table 6. <br /> 27 <br />