Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:55:41 PM
Creation date
9/10/2020 3:33:26 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda 09-15-20 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 09-15-20 Virtual Business Meeting
Minutes 09-15-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Minutes 09-22-2020 Continued Virtual Business Meeting from 9/15/2020
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
149 <br /> RESEARCH TRIANGLE LOGISTICS PARK TRAFFIC IMPACT ANALYSIS <br /> Capacity Analysis <br /> June 4, 2020 <br /> 6.2 2023 NO-BUILD CAPACITY ANALYSIS <br /> The 2023 No-Build scenario results show that all intersections and approaches will operate at LOS D or better in both <br /> peak periods with one exception. That is, the eastbound approach to the intersection of Old NC 86 at 1-40 eastbound <br /> ramps operates at LOS F in both AM and PM peak hours. The no-build level of service and delay is listed below in <br /> Table 5. <br /> Table 5: Level of Service and Delay for 2023 No-Build Conditions <br /> Existing 2023 No-Build <br /> Intersection Approach Intersection AM Peak PM Peak <br /> Control <br /> LOS LOS <br /> (Delay in sec./veh.) (Delay in sec./veh.) <br /> Overall Intersection C (21.2) C (22.6) <br /> Old NC 86 at EB Approach D(43.5) D (43.6) <br /> Waterstone Drive/ WB Approach Signalized C(28.5) C(32.2) <br /> Rippy Lane NB Approach B(14.3) B (16.5) <br /> SB Approach C(23.7) C(21.4) <br /> Overall Intersection A(1.0) A(1.7) <br /> Old NC 86 at WB Approach One-Way D(30.2) D (34.3) <br /> 1-40 WB Ramps NB Left-Turn Controlled B(11.3) B (11.8) <br /> SB Approach A(0.0) A(0.0) <br /> Overall Intersection F(###) F(158.3) <br /> Old NC 86 at EB Approach One-Way F(###) F(###) <br /> 1-40 EB Ramps NB Approach Stop A(0.0) A(0.0) <br /> Controlled <br /> SB Left-Turn C(15.9) B(3.1) <br /> Overall Intersection One-Way A(0.2) A(0.2) <br /> Old NC 86 at Service Road EB Approach Stop B(13.8) B(14.4) <br /> NB Left-Turn Controlled A(8.0) A(8.3) <br /> Overall Intersection A(5.2) A(2.4) <br /> Old NC 86 at EB Approach One-Way Sto C(24.8) C(19.4) <br /> Davis Road NB Left-Turn Controlled A(8.1) A(8.4) <br /> SB Approach A(0.0) A <br /> ###: Delay exceeds 300 seconds/vehicle <br /> 26 <br />