Orange County NC Website
148 <br /> RESEARCH TRIANGLE LOGISTICS PARK TRAFFIC IMPACT ANALYSIS <br /> Capacity Analysis <br /> June 4, 2020 <br /> 6.1 2020 EXISTING CAPACITY ANALYSIS <br /> The 2020 Existing scenario results show that all intersections currently operate at LOS D or better in both peak <br /> periods with one exception. That is,the eastbound approach of the Old NC 86 at 1-40 eastbound ramp operates at <br /> LOS E in the PM peak hour. The level of service and delay for the existing traffic conditions is listed below in Table 4. <br /> Table 4: Level of Service and Delay for 2020 Existing Conditions <br /> Existing 2020 Existing <br /> Intersection Approach Intersection AM Peak PM Peak <br /> Control <br /> LOS LOS <br /> (Delay in sec./veh.) (Delay in sec./veh.) <br /> Overall Intersection B(16.4) B(16.4) <br /> Old NC 86 at EB Approach D (43.4) D (43.4) <br /> Waterstone Drive/ WB Approach Signalized C(26.1) C (31.7) <br /> Rippy Lane NB Approach B(10.4) B (11.3) <br /> SB Approach B (17.9) B (13.5) <br /> Overall Intersection A(1.0) A(1.6) <br /> Old NC 86 at WB Approach One-Way <br /> e Way C (21.9) C(22.0) <br /> 1-40 WB Ramps NB Left-Turn op Controlled A(9.9) A(9.9) <br /> SB Approach A(0.0) A(0.0) <br /> Overall Intersection F(51.2) A(7.0) <br /> Old NC 86 at EB Approach One-Way F (###) F (54.6) <br /> I-40 EB Ramps NB Approach Stop <br /> Controlled A(0.0) A(0.0) <br /> SB Left-Turn B (12.1) A(9.8) <br /> Overall Intersection One-Way A(0.2) A(0.2) <br /> Old NC 86 at EB Approach Stop B (13.1) B (13.5) <br /> Service Road <br /> NB Left-Turn Controlled A(8.0) A(8.2) <br /> Overall Intersection A(4.8) A(2.3) <br /> Old NC 86 at EB Approach One-Way Stop C(21.1) C (17.2) <br /> Davis Road NB Left-Turn Controlled A(8.0) A(8.3) <br /> SB Approach A(0.0) A <br /> ###: Delay exceeds 300 seconds/vehicle <br /> 25 <br />