Orange County NC Website
134 <br /> RESEARCH TRIANGLE LOGISTICS PARK TRAFFIC IMPACT ANALYSIS <br /> Inventory of Traffic Conditions <br /> June 4, 2020 <br /> Table 1: Existing Conditions <br /> Road Primary Cross- Functional 2018 AADT2 Speed Road Name Maintenance <br /> Number Section ' Limit Agency <br /> Classification (vpd) (mph) 9 y <br /> Waterstone N/A 4-Lane Divided Local Road None 35 Hillsborough <br /> Drive Provided <br /> Rippy Lane SR 1224 2-Lane Local Road None Un- NCDOT <br /> Undivided Provided posted <br /> 1-40 Ramps 1-40 4-Lane Divided Other Principal 74,000 65 NCDOT <br /> Arterial <br /> Old NC 86 SR 1009 2-Lane Minor Arterial 6,550 45 NCDOT <br /> Undivided <br /> Service Road N/A Undivided ne Local Road P oo ne ded 25 NCDOT <br /> Davis Road SR 1129 2-Lane Local Road 2,300 45 NCDOT <br /> Undivided <br /> 2.3 PLANNED PROJECTS <br /> Two projects are planned within the study area. Those are U-5845 (Churton Street Widening)and 1-3306A(1-40 <br /> Widening). Both seek to make improvements to Old NC 86 at and north of the 1-40 interchange, but no <br /> improvements are planned in the immediate vicinity of the site. <br /> The traffic forecast for 1-3306A was revised in July 2019 and states that Assumptions and changes in the distribution <br /> of population and employment in the forecast study area are implicit in the Triangle Regional Model (TRMv6)that was <br /> updated in May of 2019. The rezoning for Settler's Pointe occurred on January 23,2018. Therefore,the zoning of <br /> this project was included and therefore the development was accounted for in the traffic forecast. <br /> 11 <br />