Orange County NC Website
128 <br /> RESEARCH TRIANGLE LOGISTICS PARK TRAFFIC IMPACT ANALYSIS <br /> RECOMMENDATIONS <br /> Based on the findings of this study, specific improvements have been identified and are recommended to be <br /> completed as part of the proposed development. These improvements are listed below. <br /> Old NC 86 at Waterstone Drive / Rippy Lane <br /> No improvements are recommended at this intersection. <br /> Old NC 86 at 1-40 Westbound Ramps <br /> No improvements are recommended at this intersection. <br /> Old NC 86 at 1-40 Eastbound Ramps <br /> • Install a traffic signal. <br /> The 2017 Settler's Pointe TIA concluded that this intersection met the criteria for installation of a traffic signal based <br /> upon their review of the 2016 collected traffic data against Traffic Signal Warrant 3B (Peak Hour Vehicular Volume) <br /> Old NC 86 at Service Road <br /> • Construct an exclusive eastbound right-turn lane with 100 feet of full-width storage and appropriate taper. <br /> • Restripe the northbound approach to provide 50 feet of full-width storage and appropriate taper. <br /> Old NC 86 at Davis Road <br /> • Install a traffic signal. It is recommended that this signal not be installed until Driveway D is constructed and <br /> open to traffic. <br /> Service Road at Warehouse A Driveway <br /> • Construct Warehouse A Driveway as a single-lane approach operating under the control of a stop-sign. <br /> Service Road at Warehouse B Driveway <br /> • Construct Warehouse B Driveway as a single-lane approach operating under the control of a stop-sign. <br /> Service Road at Warehouse C Driveway <br /> • Construct Warehouse C Driveway as a single-lane approach operating under the control of a stop-sign. <br /> Davis Road at Warehouse D Driveway <br /> • Construct Warehouse D Driveway as a single-lane approach operating under the control of a stop-sign. <br /> These recommendations are illustrated on Figure ES-2. <br /> v <br />