Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:55:41 PM
Creation date
9/10/2020 3:33:26 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda 09-15-20 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 09-15-20 Virtual Business Meeting
Minutes 09-15-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Minutes 09-22-2020 Continued Virtual Business Meeting from 9/15/2020
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
123 <br /> RESEARCH TRIANGLE LOGISTICS PARK TRAFFIC IMPACT ANALYSIS <br /> LIST OF TABLES <br /> Table ES-1: Level of Service & Delay Summary ........................................................................iv <br /> Table 1: Existing Conditions......................................................................................................11 <br /> Table 2: Site ITE Trip Generation..............................................................................................13 <br /> Table 3: Level of Service Criteria ..............................................................................................23 <br /> Table 4: Level of Service and Delay for 2020 Existing Conditions.............................................25 <br /> Table 5: Level of Service and Delay for 2023 No-Build Conditions............................................26 <br /> Table 6: Level of Service and Delay for 2023 Build Conditions .................................................28 <br /> Table 7: Level of Service and Delay for 2023 Build-Improved Conditions..................................30 <br /> Table 8: Maximum Queue Length Summary.............................................................................31 <br /> LIST OF FIGURES <br /> FigureES-1: Site Plan...............................................................................................................iii <br /> Figure ES-2: Recommended Improvements .............................................................................vi <br /> Figure 1: Site Location and Study Area Map............................................................................. 8 <br /> Figure 2: Proposed Site Plan .................................................................................................... 9 <br /> Figure 3: 2020 Existing Lane Configurations and Traffic Control...............................................11 <br /> Figure 4: Existing (2020) Traffic Volumes.................................................................................15 <br /> Figure 5: Historic Growth Traffic Volumes (2016-2020)............................................................16 <br /> Figure 6: Historic Growth Traffic Volumes (2020-2023)............................................................17 <br /> Figure 7: Approved Development Traffic Volumes ...................................................................18 <br /> Figure 8: 2023 No-Build Traffic Volumes..................................................................................19 <br /> Figure 9: Site Trip Distribution..................................................................................................20 <br /> Figure 10: Site Trip Assignment...............................................................................................21 <br /> Figure 11: 2023 Build Traffic Volumes ......................................................................................22 <br /> Figure 12: Build Recommended Lane Configurations ...............................................................33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.