Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:55:41 PM
Creation date
9/10/2020 3:33:26 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda 09-15-20 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 09-15-20 Virtual Business Meeting
Minutes 09-15-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Minutes 09-22-2020 Continued Virtual Business Meeting from 9/15/2020
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
109 <br /> ATTACHEMENT A <br /> TO BE COMPLETED ONLY IF INVENTORY SITES ARE IDENTIFIED IN I.E. <br /> (ATTACH ADDITIONAL SHEETS IF NECESSARY) <br /> (1) a. Impact on Resource from Proposed Development <br /> • Minor impacts will result from the proposed development due to a road <br /> crossing necessary to provide connectivity between the four proposed <br /> buildings. The crossing has been designed as a perpendicular crossing to <br /> minimize impacts, and is located higher in the watershed where the <br /> stream is smaller to further reduce impact quantities proposed. <br /> Unavoidable impacts to streams, riparian buffers, and floodplains are as <br /> follows: <br /> Streams: 68 linear feet (LF) <br /> Floodplains 0.26 acres (ac.) <br /> Floodway: 2,759 square feet (SF) <br /> Buffer Zone 1: 3,899 square feet (SF) <br /> Buffer Zone 2: 4,838 square feet (SF) <br /> b. Proposed Mitigation <br /> Compensatory mitigation for stream and riparian buffer impacts is not <br /> anticipated to be required by the US Army Corps of Engineers or the NC Division <br /> of Water Resources based on the small quantity of impacts. Perpendicular road <br /> crossings of less than 1/3 d of an acre and less than 150 LF are considered <br /> "allowable" per Neuse River Basin Riparian Buffer Rules. Floodplain impacts will <br /> be minor, and a LOMR has been prepared and submitted to the NC Floodplain <br /> Management Program and is currently under review. <br />
The URL can be used to link to this page
Your browser does not support the video tag.