Orange County NC Website
<br />18 <br /> <br />Sewer <br />A 12-inch and 8-inch gravity sewer line are proposed to be extended to the site under Interstate 40 in <br />order to serve the site from the north. Existing and proposed public sewer infrastructure and capacity <br />will sufficiently serve this project. <br /> <br />7.2 How much water and sewer is planned for the project and is there adequate capacity? <br />The proposed RTLP project is planning on using 108,000 gallons per day of water and sewer for their <br />project of 2.25 million square feet of building area. The water and sewer usage is primarily for <br />employees within the proposed development (e.g. for bathrooms, kitchen/break areas, landscaping, <br />etc.) since the project does not plan to use water in the processing or manufacturing of any products. <br />Orange County has a long-standing written agreement with the Town of Hillsborough to accommodate <br />water and sewer service in this area. The proposed development is located in a coordinated planning <br />area between the parties that has been designated for public water and sewer and ‘urban’ <br />development. <br /> <br /> <br /> <br />568