Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:28:37 PM
Creation date
9/10/2020 3:14:30 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ii. Final location/size shall be reviewed/approved by staff as part of a <br />site plan submitted in accordance with Section 2.5 of the UDO and <br />the conditions contained herein. <br />g. Lighting: <br />i. Lighting plans shall be prepared in accordance with Section 6.11 of <br />the UDO; <br />ii. All lighting shall be full-cut off fixtures; <br />iii. Lighting in parking areas shall observe a height limit of 45 ft.; <br />iv. All lighting shall comply with maximum foot-candle limits at property <br />lines as noted in Section 6.11.6.A of the UDO; <br />v. Lighting within the Project shall abide by the standards detailed in <br />Section 6.11.8 of the UDO. <br />h. Stream Buffers: The Project shall comply with the provisions of Section <br />6.13 of the UDO. <br /> STAFF COMMENT: The applicant had inquired about reducing <br />required stream/floodplain buffers to a minimum standard of 50 ft.. <br />This was suggested as a way of allowing for a perimeter buffer of <br />100 ft. as requested by staff. <br />At this time, staff has not made a determination on this request but <br />believes it warrants discussion. <br />Staff requests review of the item/concern with the applicant and <br />BOCC members in order to fashion final condition language that is <br />mutually agreeable to all parties. <br />i. Stormwater regulations: The Project shall comply with the provisions of <br />Section 6.14 of the UDO. <br />j. Erosion Control regulations. The Project shall comply with the <br />provisions of Section 6.15 of the UDO <br />k. Flood regulations: The Project shall comply with the provisions of <br />Section 6.21 of the UDO. <br /> <br />VI. PERMITTED AND PROHIBITED LAND USES: <br /> STAFF COMMENT: There is no concern over the proposed land <br />uses, most of which would be permitted under the County’s general <br />use zoning designation for the property (i.e. EDH-4 or EDH-5) and <br />were permitted under the current MPD-CZ (Settlers Point). <br /> Staff has expressed reservations with respect to the format of how <br />permitted/prohibited land uses are listed. <br />540
The URL can be used to link to this page
Your browser does not support the video tag.