Orange County NC Website
2. Proposed support facilities (i.e. roadways and access points, parking, pedestrian and <br />vehicular circulation systems, screening and buffer areas, etc.) and/or <br />3. All other matters the County may find appropriate or the petitioner may propose. <br />If approved, the Zoning Atlas will be amended and the zoning designation of the property shall <br />be changed to MPD-CZ. Development, including permitted land uses, would be in accordance <br />with the approved development proposal and all conditions imposed as part of the zoning atlas <br />amendment process. <br /> <br />Development of the various parcel(s) shall only be permitted through the review and approval of <br />site plan application(s) in accordance within Section 2.5 of the UDO. Staff is responsible for <br />verifying all imposed conditions are adhered to and allow for final peer review by members of <br />the Development Advisory Committee (DAC) as detailed within Section 1.9 of the UDO. <br /> <br />Proposal: The applicant is proposing to rezone the 3 identified parcels to a new MPD-CZ district <br />allowing for the development of a new master planned project, referred to as the Research <br />Triangle Logistics Park (RTLP) summarized as follows: <br />1. Construction of approximately 2,250,000 sq.ft. of building area supporting non- <br />residential development; <br />2. Preservation of approximately 41 acres (25%) of land as open space. <br />3. Permitted land uses within the new MPD-CZ district would include: <br />a. Health technology, <br />b. Information sciences and engineering, <br />c. Advanced and light manufacturing, <br />d. Scientific research and laboratories, <br />e. Logistics/supply operations, <br />f. Warehousing and supply chain fulfillment services. <br />The applicant has also provided a list of land uses that would be strictly prohibited <br />within the new district; <br />4. Vehicular access would be through Service Road, running parallel with Interstate 40, <br />and Davis Road; <br />5. Buildings would observe a 6 story height limit consistent with County regulations. <br />Accessory structures (i.e. water tower, telecommunication tower, etc.) may be higher. <br />6. The applicant is proposing imposition of development and design standards (i.e. <br />architectural design, signage, internal and external setback limits, height limits, <br />landscaping/buffer standards, outdoor lighting standards, erosion control/stormwater, <br />etc.) governing overall development of the project if the MPD-CZ district is approved <br />by the County. <br /> <br /> <br /> <br /> <br />5