Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:28:37 PM
Creation date
9/10/2020 3:14:30 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />undeveloped areas. The adjacent parcels to the North are opposite the right-of-way of Hwy 40 <br />and are zoned EDH-2. The parcels to the South and West are largely residential and are zoned <br />R1. The properties to the East are both R1 and EDH-5. Appendix A provides a listing of all <br />property owners within 1,000 feet of the project as currently laid out. <br /> <br />As previously indicated, RTLP is designed to accommodate and protect adjacent properties and <br />their current uses through the use of land use buffers and the protection of existing natural <br />features. Please refer to SECTION V. OPEN SPACE for a detailed explanation of our proposed land <br />use buffer program. <br /> <br />SECTION 1-5 CONSTRUCTION SCHEDULE <br /> <br />All public water and sewer lines shall be extended in accordance with the Town of Hillsborough <br />utility policies. <br />Sanitary sewer will be extended to the property under Interstate 40 prior to or during the initial <br />phases of construction. Depending on the construction sequencing of the building structures, the <br />main will be extended to the appropriate building prior to that building’s required Certificate of <br />Occupancy. <br />A new water main will be extended along the Interstate 40 service road to serve the property. A <br />looped water system will ultimately be provided with a connection back to the public system at a <br />point on the Service Road or Old NC 86, as the case may be. So long as the flows and pressures <br />are sufficient for the buildings and proposed uses, the loop will not be required for building <br />certificates of occupancy. <br /> <br />Development shall utilize Service Road to obtain access to Old NC Highway 86. At the time <br />development exceeds allowable traffic trips, as defined within the Master Traffic Impact Analysis <br />(TIA), an alternative traffic improvement shall be required to serve the proposed development. This <br />alternative shall be reviewed and approved by Orange County and the NC Department of <br />Transportation and shall be installed in conjunction with the proposed development project <br />generating the need for said alternative traffic improvement. <br /> <br />2. LAND USE PROGRAM <br />This request involves the rezoning of the aforementioned parcels to what the Applicant refers to <br />as the Research Triangle Logistics Park Master Planned Conditional Zoning District. As we <br />understand the process, if approved, the various parcels making up the project are going to have <br />a zoning designation of MPD-CZ and will abide by the development standards adopted as part of <br />the process. This new development is compatible with the purpose and intent of the Orange <br />County Comprehensive Plan. Four development areas or pods (wh ich are for illustrative purposes <br />only and may differ in the final site plan) are identified on the master plan set along with <br />illustrative depictions of buildings, loading and parking. <br />The following general development regulations are respectfully being proposed for the project: <br /> <br /> <br />SECTION 2-1 LAND USES <br />42
The URL can be used to link to this page
Your browser does not support the video tag.