Orange County NC Website
Page 15 <br /> <br />kimley-horn.com 421 Fayetteville Street, Suite 600, Raleigh, NC 27601 919 677 2000 <br /> <br />provides the majority of required detail(s), the submittal should be modified as <br />indicated: <br />1. Denote the location of all utility lines (i.e. sewer, water, r eclaimed water, <br />stormwater management, electrical service, cable, telephone, etc.) on the map. <br />As part of this modification please provide a key/legend detailing: <br />a. Existing infrastructure in place, <br />b. What infrastructure is expected to be constructed by Orange County/Town <br />of Hillsborough, and <br />c. New infrastructure serving the project. <br />As part of this requirement, staff will need detailed information on <br />proposed line types, sizes, anticipated construction, etc. <br />b. Denote the anticipated location of sidewalks to assist staff ascertain if there <br /> will be any conflicts with utility location. <br />c. The map will need to be modified to include the detailed design calculations for <br />the project indicating that the proposed utility lines are sufficient for expected <br />development and associated/estimated density for the project. <br />d. Include a note indicating: 'All onsite utilities shall be underground unless <br />approved by the Board of County Commissioners’. <br />e. Indicate connection points to various utility lines. <br />f. Denote the location of any anticipated/planned utility infrastructure (i.e. pump <br />stations, etc.). <br />g. Please include the following information on Sheet C-4: <br />a. Provide detail on anticipated fire flow for the proposed utility lines with <br />detail on how same will support the project. As a general reminder fire <br />flow requirements are necessary for consideration when sizing water <br />lines. <br />b. Provide detail on the anticipated placement of manholes and elevations <br />same. This will include the provision of a typical manhole construction <br />detail. <br />c. Anticipated stub out locations. <br />d. All existing and anticipated utility line easements. <br />e. Provide sufficient detail outlining how the project will comply with the <br />Town of Hillsborough water/sewer utility line construction standards. <br />f. Additional detail on expected build-out. This information shall be <br />essential in evaluating the ability of installed infrastructure to meet <br />current and future needs of the project. <br />g. Information outlining opportunities for water and sewer extension to <br />serve adjacent parcels. <br />NOTE: The ability to serve surrounding parcels is predicated on said <br />parcels location within a primary service area as detailed within the <br />Water and Sewer Management, Planning, and Boundary Agreement <br />(WASMPBA), the County Comprehensive Plan, and the Orange <br />County/Town of Hillsborough Joint Planning Land Use Plan. <br />400