Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:28:37 PM
Creation date
9/10/2020 3:14:30 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• SOUTH: Davis Road; Hillsborough United Methodist Church; <br />Undeveloped property; Single-family residential property zoned <br />Rural Residential (R-1) ranging in size from 2 to 12 acres. <br />• EAST: Single-family residential and undeveloped property <br />zoned Economic Development Hillsborough Limited Office <br />(EDH-2) ranging in size from 1 to 12 acres; Old NC Highway 86. <br />• WEST: Single-family residential and undeveloped property <br />zoned Rural Residential (R-1) ranging in size from 1-½ to 50 <br />acres. <br /> <br />MPD Conditional Zoning (CZ) Process: Involves approval of a rezoning petition and a master <br />development plan allowing for the development of a specific land use categories. Applications <br />are processed in a legislative manner (i.e. does not require sworn testimony or evidence) and <br />decisions are based on the BOCC’s determination that the project is consistent with the purpose <br />and intent of the Comprehensive Plan. <br /> <br />As this is a MPD-CZ proposal, a formal site plan is not required to be submitted as part of the <br />rezoning approval. Applicants are required to produce a master concept plan consistent with <br />the provisions of Section 6.7 of the UDO. <br /> <br />The application package was posted to Planning’s website on or about June 19, 2020 and can <br />be accessed at: https://www.orangecountync.gov/1722/Current-Interest-Projects. <br /> <br />Development Process, Schedule, and Action: The typical cadence for the review of a CZ <br />application is: <br />• First Action – Planning staff schedules a Neighborhood Information Meeting (NIM). <br /> Staff Comment – DONE. This meeting was held in an on-line format on July 15, <br />2020. Notes from this meeting are contained within Attachment 7. <br />• Second Action – The Planning Board reviews the application at a regular meeting <br />and makes a recommendation to the BOCC. <br /> Staff Comment - DONE. The Planning Board began review of the project at its <br />regular August 5, 2020 meeting, which was adjourned to a special meeting on <br />August 19, 2020 to allow for continued discussion. Excerpts of minutes from both <br />meetings are contained in Attachment 8. <br />• Third Action – The BOCC receives the Planning Board recommendation and makes <br />a decision at an advertised public hearing. <br /> Staff Comment – Being held on September 15, 2020. <br /> NOTE: As the public hearing is being held remotely, there is a 24-hour waiting <br />period required before the BOCC can make a decision, per State legislation. The <br />purpose of the 24-hour waiting period is to allow for submission of written <br />comments. <br />Per Section 2.9.2 (F) (3) of the UDO, mutually agreed upon conditions can be imposed as part <br />this process only if they address: <br />1. The compatibility of the proposed development with surrounding property, <br />4
The URL can be used to link to this page
Your browser does not support the video tag.