Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:28:37 PM
Creation date
9/10/2020 3:14:30 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 13 <br /> <br />kimley-horn.com 421 Fayetteville Street, Suite 600, Raleigh, NC 27601 919 677 2000 <br /> <br />iii. Sheet C-2 should display the following information: <br />1. Proposed floor area ratio (FAR) for the Project; <br />2. Proposed open space; <br />3. Breakdown of landscape/buffer area (i.e. acreage) for the Project; <br />4. Proposed setbacks (internal and external); <br />5. Anticipated number of parking spaces, loading berths/stalls, etc.; <br />6. Maximum allowable building height (in general and per each <br />individual development ‘pod’ if there will be a difference); <br />7. Anticipated number of parking spaces with access to alternative <br />energy charging stations (if proposed); <br />8. Number of ‘park and ride’ spaces (if proposed). <br /> <br />Response: Site plans updated accordingly. <br /> <br />Comment: iv. Development of Building D appears to ‘cross’ an existing property line. <br />There needs to be some explanation of boundary/development areas on the master <br />plan set providing an explanation of what will be included within individual <br />development areas of the Project. <br /> <br />Response: Property lines have been updated on this submittal. <br /> <br />Comment: v. Sheet(s) C-2 and C-2.4 indicate there will be development activity <br />occurring within an existing utility easement, specifically a power line easement. <br />Staff requires documentation indicating either the power line/easement is being <br />relocated or the utility provider will allow for the development of parking and <br />structures within their easement. <br /> <br />Response: A copy of the Duke Energy easement is included with this submittal. <br /> <br />Comment: vi. Sheet C-6: Label and document all proposed and/or required Iandscape/ <br />buffer areas for the Project including, but not limited to: <br />1. Perimeter buffers; <br />2. In-between lot/development pod landscape areas; <br />3. Internal landscaping (i.e. parking lot and parking lot perimeter, building, <br />preservation of existing significant foliage, etc.); <br />4. Stream/floodplain buffers; <br />5. Major Transportation Corridor (MTC) buffers, including requested breaks <br />consistent with Section 6.6.4 of the UDO. <br /> <br />Response: These items have been labeled as requested. <br /> <br />Comment: vii. Sheet C-6 needs a legend detailing what the proposed landscape/buffer <br />areas are. <br />398
The URL can be used to link to this page
Your browser does not support the video tag.