Orange County NC Website
Hillsborough Industrial Site 2023 No-Build PM <br />110: Old NC 86 & I-40 WB Ramp Timing Plan: PM Peak <br />HCM 6th TWSC Synchro 10 Report <br />Stantec Page 1 <br />Intersection <br />Int Delay, s/veh 1.7 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 0 0 0 44 4 580 84 440 0 0 846 159 <br />Future Vol, veh/h 0 0 0 44 4 580 84 440 0 0 846 159 <br />Conflicting Peds, #/hr 0 00000000000 <br />Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free <br />RT Channelized - - None - - Free - - None - - None <br />Storage Length - - - 225 - 0 225 ----- <br />Veh in Median Storage, # - 2 - - 0 - - 0 - - 0 - <br />Grade, % - 0 - - 0 - - 0 - - 0 - <br />Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 <br />Heavy Vehicles, % 2 22222222222 <br />Mvmt Flow 0 0 0 49 4 644 93 489 0 0 940 177 <br /> <br />Major/Minor Minor1 Major1 Major2 <br />Conflicting Flow All 1145 1792 - 1117 0 - - - 0 <br /> Stage 1 675 675 - - - - - - - <br /> Stage 2 470 1117 - - - - - - - <br />Critical Hdwy 6.636.53-4.13----- <br />Critical Hdwy Stg 1 5.43 5.53 - - - - - - - <br />Critical Hdwy Stg 2 5.83 5.53 - - - - - - - <br />Follow-up Hdwy 3.519 4.019 - 2.219 ----- <br />Pot Cap-1 Maneuver 206 80 0 623 - 0 0 - - <br /> Stage 1 505 452 0 - - 0 0 - - <br /> Stage 2 596 282 0 - - 0 0 - - <br />Platoon blocked, %-- - <br />Mov Cap-1 Maneuver 175 0 - 623 ----- <br />Mov Cap-2 Maneuver 175 0 - - - - - - - <br /> Stage 1 430 0 - - - - - - - <br /> Stage 2 596 0 - - - - - - - <br /> <br />Approach WB NB SB <br />HCM Control Delay, s 34.3 1.9 0 <br />HCM LOS D <br /> <br />Minor Lane/Major Mvmt NBL NBTWBLn1WBLn2 SBT SBR <br />Capacity (veh/h)623 - 175 - - - <br />HCM Lane V/C Ratio 0.15 - 0.305 - - - <br />HCM Control Delay (s) 11.8 - 34.3 0 - - <br />HCM Lane LOS B - D A - - <br />HCM 95th %tile Q(veh) 0.5 - 1.2 - - - <br />326