Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:28:37 PM
Creation date
9/10/2020 3:14:30 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hillsborough Industrial Site 2023 No-Build AM <br />110: Old NC 86 & I-40 WB Ramp Timing Plan: AM Peak <br />HCM 6th TWSC Synchro 10 Report <br />Stantec Page 1 <br />Intersection <br />Int Delay, s/veh 1 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 0 0 0 19 4 470 75 499 0 0 853 95 <br />Future Vol, veh/h 0 0 0 19 4 470 75 499 0 0 853 95 <br />Conflicting Peds, #/hr 0 00000000000 <br />Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free <br />RT Channelized - - None - - Free - - None - - None <br />Storage Length - - - 225 - 0 225 ----- <br />Veh in Median Storage, # - 2 - - 0 - - 0 - - 0 - <br />Grade, % - 0 - - 0 - - 0 - - 0 - <br />Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 <br />Heavy Vehicles, % 2 22222222222 <br />Mvmt Flow 0 0 0 21 4 522 83 554 0 0 948 106 <br /> <br />Major/Minor Minor1 Major1 Major2 <br />Conflicting Flow All 1194 1774 - 1054 0 - - - 0 <br /> Stage 1 720 720 - - - - - - - <br /> Stage 2 474 1054 - - - - - - - <br />Critical Hdwy 6.636.53-4.13----- <br />Critical Hdwy Stg 1 5.43 5.53 - - - - - - - <br />Critical Hdwy Stg 2 5.83 5.53 - - - - - - - <br />Follow-up Hdwy 3.519 4.019 - 2.219 ----- <br />Pot Cap-1 Maneuver 192 82 0 658 - 0 0 - - <br /> Stage 1 481 431 0 - - 0 0 - - <br /> Stage 2 593 302 0 - - 0 0 - - <br />Platoon blocked, %-- - <br />Mov Cap-1 Maneuver 168 0 - 658 ----- <br />Mov Cap-2 Maneuver 168 0 - - - - - - - <br /> Stage 1 420 0 - - - - - - - <br /> Stage 2 593 0 - - - - - - - <br /> <br />Approach WB NB SB <br />HCM Control Delay, s 30.2 1.5 0 <br />HCM LOS D <br /> <br />Minor Lane/Major Mvmt NBL NBTWBLn1WBLn2 SBT SBR <br />Capacity (veh/h)658 - 168 - - - <br />HCM Lane V/C Ratio 0.127 - 0.152 - - - <br />HCM Control Delay (s) 11.3 - 30.2 0 - - <br />HCM Lane LOS B - D A - - <br />HCM 95th %tile Q(veh) 0.4 - 0.5 - - - <br />320
The URL can be used to link to this page
Your browser does not support the video tag.