Orange County NC Website
Hillsborough Industrial Site 2023 No-Build AM <br />100: Old NC 86 & Rippy Lane/Waterstone Drive Timing Plan: AM Peak <br />Lanes, Volumes, Timings Synchro 10 Report <br />Stantec Page 2 <br />Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Queue Length 50th (ft)6 108 106 0 2 137 0 177 84 <br />Queue Length 95th (ft)26 175 172 34 11 255 48 220 185 <br />Internal Link Dist (ft)933 1361 1030 1228 <br />Turn Bay Length (ft)300 200 425 300 <br />Base Capacity (vph)249 309 310 803 315 1669 1249 754 2533 <br />Starvation Cap Reductn 0 00000000 <br />Spillback Cap Reductn 0 00000000 <br />Storage Cap Reductn 0 00000000 <br />Reduced v/c Ratio 0.05 0.46 0.45 0.36 0.01 0.35 0.39 0.63 0.31 <br />Intersection Summary <br />Area Type:Other <br />Cycle Length: 120 <br />Actuated Cycle Length: 120 <br />Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBT, Start of Green <br />Natural Cycle: 90 <br />Control Type: Actuated-Coordinated <br />Maximum v/c Ratio: 0.69 <br />Intersection Signal Delay: 21.2 Intersection LOS: C <br />Intersection Capacity Utilization 57.4%ICU Level of Service B <br />Analysis Period (min) 15 <br />Splits and Phases: 100: Old NC 86 & Rippy Lane/Waterstone Drive <br />319