Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:28:37 PM
Creation date
9/10/2020 3:14:30 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hillsborough Industrial Site 2023 Build-Improved PM <br />PM Peak <br />Queuing and Blocking Report SimTraffic Report <br />Stantec Page 6 <br />Intersection: 100: Old NC 86 & Rippy Lane/Waterstone Drive <br />Movement EB WB WB WB NB NB NB NB SB SB SB SB <br />Directions Served LTR L LT R L T T R L L T TR <br />Maximum Queue (ft)49 225 234 219 19 225 253 139 174 207 168 178 <br />Average Queue (ft)12 126 130 93 2 113 127 58 66 119 78 80 <br />95th Queue (ft)38 201 209 178 11 198 216 111 151 188 146 149 <br />Link Distance (ft)955 1363 1363 1008 1008 1266 1266 <br />Upstream Blk Time (%) <br />Queuing Penalty (veh) <br />Storage Bay Dist (ft)300 200 425 300 300 <br />Storage Blk Time (%)0 0 1 <br />Queuing Penalty (veh)0 0 0 <br />Intersection: 110: Old NC 86 & I-40 WB Ramp <br />Movement WB WB NB NB SB SB <br />Directions Served LT R L T T TR <br />Maximum Queue (ft) 149 47 171 22 27 70 <br />Average Queue (ft) 56 3 68 1 1 7 <br />95th Queue (ft)121 46 134 22 19 41 <br />Link Distance (ft)1219 677 1008 1008 <br />Upstream Blk Time (%) <br />Queuing Penalty (veh) <br />Storage Bay Dist (ft) 225 225 <br />Storage Blk Time (%)0000 <br />Queuing Penalty (veh)2020 <br />Intersection: 120: Old NC 86 & I-40 EB Ramp <br />Movement EB EB NB SB SB <br />Directions Served LT R TR L T <br />Maximum Queue (ft) 184 123 477 620 350 <br />Average Queue (ft) 93 51 380 350 80 <br />95th Queue (ft)163 104 519 587 231 <br />Link Distance (ft)1130 380 677 677 <br />Upstream Blk Time (%)18 2 0 <br />Queuing Penalty (veh)110 8 1 <br />Storage Bay Dist (ft)200 <br />Storage Blk Time (%)0 <br />Queuing Penalty (veh) 0 <br />315
The URL can be used to link to this page
Your browser does not support the video tag.