Orange County NC Website
Hillsborough Industrial Site 2023 Build-Improved PM <br />130: Old NC 86 & Service Road Timing Plan: PM Peak <br />HCM 6th TWSC Synchro 10 Report <br />Stantec Page 1 <br />Intersection <br />Int Delay, s/veh 6.2 <br />Movement EBL EBR NBL NBT SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 147 28 13 468 437 57 <br />Future Vol, veh/h 147 28 13 468 437 57 <br />Conflicting Peds, #/hr 0 00000 <br />Sign Control Stop Stop Free Free Free Free <br />RT Channelized - None - None - None <br />Storage Length 0 100 50 - - - <br />Veh in Median Storage, # 0 - - 0 0 - <br />Grade, % 0 - - 0 0 - <br />Peak Hour Factor 90 90 90 90 90 90 <br />Heavy Vehicles, % 2 22222 <br />Mvmt Flow 163 31 14 520 486 63 <br /> <br />Major/Minor Minor2 Major1 Major2 <br />Conflicting Flow All 1066 518 549 0 - 0 <br /> Stage 1 518 ----- <br /> Stage 2 548 ----- <br />Critical Hdwy 6.42 6.22 4.12 - - - <br />Critical Hdwy Stg 15.42----- <br />Critical Hdwy Stg 25.42----- <br />Follow-up Hdwy 3.518 3.318 2.218 - - - <br />Pot Cap-1 Maneuver 246 558 1021 - - - <br /> Stage 1 598 ----- <br /> Stage 2 579 ----- <br />Platoon blocked, % - - - <br />Mov Cap-1 Maneuver 243 558 1021 - - - <br />Mov Cap-2 Maneuver 243 ----- <br /> Stage 1 590 ----- <br /> Stage 2 579 ----- <br /> <br />Approach EB NB SB <br />HCM Control Delay, s 40.3 0.2 0 <br />HCM LOS E <br /> <br />Minor Lane/Major Mvmt NBL NBTEBLn1EBLn2 SBT SBR <br />Capacity (veh/h)1021 - 243 558 - - <br />HCM Lane V/C Ratio 0.014 - 0.672 0.056 - - <br />HCM Control Delay (s) 8.6 - 45.7 11.8 - - <br />HCM Lane LOS A - E B - - <br />HCM 95th %tile Q(veh) 0 - 4.3 0.2 - - <br />295