Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:28:37 PM
Creation date
9/10/2020 3:14:30 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hillsborough Industrial Site 2023 Build-Improved AM <br />120: Old NC 86 & I-40 EB Ramp Timing Plan: AM Peak <br />Lanes, Volumes, Timings Synchro 10 Report <br />Stantec Page 6 <br />Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />LOS E E E D A <br />Approach Delay 62.7 77.7 32.6 <br />Approach LOS E E C <br />Queue Length 50th (ft)129 124 ~435 ~452 42 <br />Queue Length 95th (ft)206 201 #741 #774 1 <br />Internal Link Dist (ft)1093 477 372 643 <br />Turn Bay Length (ft)200 <br />Base Capacity (vph)295 263 606 728 1426 <br />Starvation Cap Reductn 0 0 0 0 0 <br />Spillback Cap Reductn 0 0 0 0 0 <br />Storage Cap Reductn 0 0 0 0 0 <br />Reduced v/c Ratio 0.60 0.65 1.01 0.96 0.29 <br />Intersection Summary <br />Area Type:Other <br />Cycle Length: 120 <br />Actuated Cycle Length: 120 <br />Offset: 1 (1%), Referenced to phase 2:NBT and 6:SBT, Start of Green <br />Natural Cycle: 120 <br />Control Type: Actuated-Coordinated <br />Maximum v/c Ratio: 1.01 <br />Intersection Signal Delay: 50.9 Intersection LOS: D <br />Intersection Capacity Utilization 84.8%ICU Level of Service E <br />Analysis Period (min) 15 <br />~ Volume exceeds capacity, queue is theoretically infinite. <br /> Queue shown is maximum after two cycles. <br /># 95th percentile volume exceeds capacity, queue may be longer. <br /> Queue shown is maximum after two cycles. <br />Splits and Phases: 120: Old NC 86 & I-40 EB Ramp <br />282
The URL can be used to link to this page
Your browser does not support the video tag.