Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:28:37 PM
Creation date
9/10/2020 3:14:30 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hillsborough Industrial Site 2023 Build PM <br />180: Davis Road & Warehouse D Dvwy.Timing Plan: PM Peak <br />HCM 6th TWSC Synchro 10 Report <br />Stantec Page 8 <br />Intersection <br />Int Delay, s/veh 2.2 <br />Movement EBL EBT WBT WBR SBL SBR <br />Lane Configurations <br />Traffic Vol, veh/h 4 94 176 22 60 12 <br />Future Vol, veh/h 4 94 176 22 60 12 <br />Conflicting Peds, #/hr 0 00000 <br />Sign Control Free Free Free Free Stop Stop <br />RT Channelized - None - None - None <br />Storage Length - - - - 0 - <br />Veh in Median Storage, # - 0 0 - 0 - <br />Grade, % - 0 0 - 0 - <br />Peak Hour Factor 90 90 90 90 90 90 <br />Heavy Vehicles, % 2 22222 <br />Mvmt Flow 4 104 196 24 67 13 <br /> <br />Major/Minor Major1 Major2 Minor2 <br />Conflicting Flow All 220 0 - 0 320 208 <br /> Stage 1 - - - - 208 - <br /> Stage 2 - - - - 112 - <br />Critical Hdwy 4.12---6.426.22 <br />Critical Hdwy Stg 1 - - - - 5.42 - <br />Critical Hdwy Stg 2 - - - - 5.42 - <br />Follow-up Hdwy 2.218 - - - 3.518 3.318 <br />Pot Cap-1 Maneuver 1349 - - - 673 832 <br /> Stage 1 - - - - 827 - <br /> Stage 2 - - - - 913 - <br />Platoon blocked, %- - - <br />Mov Cap-1 Maneuver 1349 - - - 671 832 <br />Mov Cap-2 Maneuver - - - - 671 - <br /> Stage 1 - - - - 825 - <br /> Stage 2 - - - - 913 - <br /> <br />Approach EB WB SB <br />HCM Control Delay, s 0.3 0 10.9 <br />HCM LOS B <br /> <br />Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 <br />Capacity (veh/h)1349 - - - 693 <br />HCM Lane V/C Ratio 0.003 - - - 0.115 <br />HCM Control Delay (s) 7.7 0 - - 10.9 <br />HCM Lane LOS A A - - B <br />HCM 95th %tile Q(veh) 0 - - - 0.4 <br />277
The URL can be used to link to this page
Your browser does not support the video tag.