Orange County NC Website
Hillsborough Industrial Site 2023 Build PM <br />150: Warehouse A Dvwy & Service Road Timing Plan: PM Peak <br />HCM 6th TWSC Synchro 10 Report <br />Stantec Page 5 <br />Intersection <br />Int Delay, s/veh 4.4 <br />Movement EBL EBR NBL NBT SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 57 4 4 36 13 21 <br />Future Vol, veh/h 57 4 4 36 13 21 <br />Conflicting Peds, #/hr 0 00000 <br />Sign Control Stop Stop Free Free Free Free <br />RT Channelized - None - None - None <br />Storage Length 0 ----- <br />Veh in Median Storage, # 0 - - 0 0 - <br />Grade, % 0 - - 0 0 - <br />Peak Hour Factor 90 90 90 90 90 90 <br />Heavy Vehicles, % 2 22222 <br />Mvmt Flow 63 4 4 40 14 23 <br /> <br />Major/Minor Minor2 Major1 Major2 <br />Conflicting Flow All 74 26 37 0 - 0 <br /> Stage 1 26 ----- <br /> Stage 2 48 ----- <br />Critical Hdwy 6.42 6.22 4.12 - - - <br />Critical Hdwy Stg 15.42----- <br />Critical Hdwy Stg 25.42----- <br />Follow-up Hdwy 3.518 3.318 2.218 - - - <br />Pot Cap-1 Maneuver 930 1050 1574 - - - <br /> Stage 1 997 ----- <br /> Stage 2 974 ----- <br />Platoon blocked, % - - - <br />Mov Cap-1 Maneuver 927 1050 1574 - - - <br />Mov Cap-2 Maneuver 927 ----- <br /> Stage 1 994 ----- <br /> Stage 2 974 ----- <br /> <br />Approach EB NB SB <br />HCM Control Delay, s 9.2 0.7 0 <br />HCM LOS A <br /> <br />Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR <br />Capacity (veh/h)1574 - 934 - - <br />HCM Lane V/C Ratio 0.003 - 0.073 - - <br />HCM Control Delay (s) 7.3 0 9.2 - - <br />HCM Lane LOS A A A - - <br />HCM 95th %tile Q(veh) 0 - 0.2 - - <br />274